Thread Content
As of May 2026, the substation for the water electrolysis hydrogen production unit in the second phase of the Yulin Chemical project, constructed by the Shaanxi branch, completed its pouring work successfully, achieving the goal one day ahead of the original schedule. Hydrogen production via water electrolysis began in March 2026. According to a report by Northern Engineering Design and Research Institute Co., Ltd. in October 2025, the project for producing hydrogen through water electrolysis as part of the Yulin Chemical Phase II project was awarded to a consortium composed of Northern Design Institute and Sinochem 11th Construction Company, under an EPC turnkey contract. Hydrogen production by electrolyzing water involves electrolyzing demineralized water, separating and purifying it, as well as compressing the hydrogen, in order to produce high-quality hydrogen and oxygen for use in downstream applications. The plant capacity is 12,000 m3/h for hydrogen and 6,000 m3/h for oxygen.
【Ten Years of Rapid Development in Chemical Engineering Equipment】The results of the world’s first pilot production line for ceramic industry ammonia-hydrogen zero-carbon combustion technology, spanning the period 3139–2026, have been approved. https://bbs.hcbbs.com/thread-5721923-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Chemical Valve Management】Series Posts–40,000 People Flee in California: A Faulty Valve Triggers a High-Risk Chemical Emergency Race Against Time https://bbs.hcbbs.com/thread-5721634-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The successful lifting of the 4,000-ton unit for China’s first large-scale low-temperature methanol washing plant, which utilizes fully domestic technology, from 2035 to 2026: http://bbs.hcbbs.com/thread-5721597-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【HaiChuan Building Design Review】Compilation Post–Understand design review requirements and improve standardized design http://bbs.hcbbs.com/thread-5721370-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2033 to 2026, China carried out the world’s first 537-day deep-sea material corrosion test at depths of 10,000 meters. https://bbs.hcbbs.com/thread-5721227-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Common Issues in Haichuan Pipeline Design】- Complete set of hand-drawn color illustrations from SH/T3012, the Standard for the Layout and Design of Metal Pipelines in the Petrochemical Industry, Section 08: Pipeline Support Layout https://bbs.hcbbs.com/thread-5721271-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】- Complete set of hand-drawn color illustrations from SH/T3012, the Standard for the Layout and Design of Metal Pipelines in the Petrochemical Industry, Section 07: Instruments and Measurement Elements https://bbs.hcbbs.com/thread-5721270-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】- Complete set of hand-drawn color illustrations from SH/T3012, the Standard for the Layout and Design of Metal Pipelines in Petrochemical Industries, Section 05–Pipelines for Utility Systems: https://bbs.hcbbs.com/thread-5721268-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2033 to 2026, China carried out the world’s first 537-day deep-sea material corrosion test at depths of 10,000 meters. https://bbs.hcbbs.com/thread-5721227-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【In-depth Discussion on Modular Installation by Haichuan】Lifting of 12 air coolers in the 524-ton integrated unit of Jiujiang Petrochemical’s aromatic compounds plant https://bbs.hcbbs.com/thread-5720586-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))