Thread Content
On June 14, the list of candidates shortlisted for the procurement of equipment for the 35MW electrolytic water hydrogen production system as part of the Three Gorges Technology multi-scenario project was made public. PRY Hydrogen Energy, Continental Hydrogen, and Sany Hydrogen Energy were ranked as the first, second, and third candidates respectively. The scope of this tender covered the equipment required for the 35MW electrolytic water hydrogen production system within the Three Gorges Technology multi-scenario project. Specifically, this includes 7 sets of alkaline water electrolysis hydrogen production equipment capable of producing 1000 Nm3/h of hydrogen under full-load conditions (at 1 atm and 0°C), with each unit having a power output of 5 MW. The equipment includes electrolyzers, gas-liquid separation systems, systems for adding water and alkali, copper bars that connect the hydrogen production power supply to the electrolyzers, flame arresters, water seals, various auxiliary utilities, as well as spare parts. It encompasses the selection, design, and manufacturing of all equipment components within the scope of supply, as well as the provision of technical drawings, testing (including type testing, factory testing, and acceptance testing), delivery, packaging, shipment, on-site delivery, unloading, storage, installation, commissioning, trial operation, acceptance testing, and training. Additionally, it includes technical services such as providing support for research activities, preparing and submitting technical documents.
【Ten Years of Rapid Development in Chemical Engineering Equipment】Overall design and manufacturing of ring-type reactors with a capacity of up to 500,000 tons per year from 1998 to 2023 https://bbs.hcbbs.com/thread-4103059-1-1.html (Source: Huahai Chuanliu – Haichuan Network)