HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The project of Pucheng Kunpeng Semiconductor Materials Co., Ltd., with a total investment of 100 million yuan, to produce 400 tons of perfluorotripropylamine per year, has been approved

2026-06-23View Original

Thread Content

On June 17, the approval notice for the registration of Pucheng Kunpeng Semiconductor Materials Co., Ltd.’s project to produce 400 tons of perfluorotripropylamine per year was made public. The details of the project are as follows: Project name: Pucheng Kunpeng Semiconductor Materials Co., Ltd.’s project for an annual production capacity of 400 tons of perfluorotripropylamine ; Construction location: High-tech Industrial Development Zone, Pucheng County, Weinan City, Shaanxi Province ; Nature of construction: Technical renovation and others ; Construction unit: Pucheng Kunpeng Semiconductor Materials Co., Ltd ; Project investment: 100 million yuan ; Construction scale and scope: The project makes use of the existing nitric acid production facility of Pucheng Kunpeng Semiconductor Materials Co., Ltd., and purchases equipment for the production of high-purity electronic chemicals such as reactors, condensers, wash towers, and storage tanks. Phase 1 of the project involves the construction of a facility for producing 40 tons of high-purity electronic-grade fluorinating agents ; Phase II project for the production of 360 tons of high-purity electronic-grade fluorinating solution ; Ultimately, a production capacity of 400 tons per year of high-purity electronic-grade fluorination solutions was achieved ;
Reply #22026-06-23
【Haichuan Safety Discussion】Hidden Dangers Around Us – Is it an overzealous requirement to install combustible gas detectors outdoors without a rain cover? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724304 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-06-23
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Forklifts Without License Plates; It does not comply with the provisions of Article 4.12.2 of the \"Rules for the Management of the Use of Special Equipment\" TSG 08—2026: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724341 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-06-24
[Haichuan’s Guide to Chemical Equipment] Series Summary Post – Getting to Know Equipment, Understanding Equipment, Making Good Use of Equipment https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719196 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #52026-06-25
【In-depth Discussion on HaiChuan’s Modular Installation】Modular construction of the steel structure for Gallery 3 of Nantong Blue Sea New Materials’ FDPE plant – achieving one-time transportation, one-time installation, and successful completion in just one attempt. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723569 (Source: HaiChuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #62026-06-27
【Ten Years of Rapid Development in Chemical Equipment】The 400,000-ton/year acrylonitrile plant at Zhenhai Refining & Chemical has been operating stably for one year (3175–2026). The independently developed S-ANT acrylonitrile technology package has been successfully industrialized. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724666 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-06-28
【Ten Years of Rapid Development in Chemical Equipment】China National Petroleum’s first project of this kind – the 50,000 tons per year 1-hexene/1-octene co-production facility at Daqing Petrochemical – was successfully completed. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723648 (Source: Haichuan Chemical Forum (HCBBS))
Reply #82026-06-29
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #92026-06-29
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Explosion-proof distribution boxes lacking warning signs indicating that the cover should not be opened after power is cut off https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724919 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))
Reply #102026-06-29
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Unsealed or Plastic-Sealed Extra Power Inlets in Explosion-Proof Electrical Equipment https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5722158 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))
Reply #112026-06-29
【Ten Years of Rapid Development in Chemical Equipment】The 300,000-ton synthetic ammonia plant built by Qinghai Salt Lake Yuanpin from 2015 to 2026 utilized internal components from Nanjing Jutuo for its synthesis towers, and these components passed the performance assessment successfully. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723201 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.