HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The first phase of Inner Mongolia Huaxing New Energy Co., Ltd.’s 4 billion cubic meters per year coal-to-natural gas project is accompanied by a liquefied natural gas project with a capacity of 1.36 million tons per year

2026-07-07View Original

Thread Content

Project Name: Phase I of Inner Mongolia Huaxing New Energy Co., Ltd.’s 4 billion cubic meters per year coal-to-natural gas project, along with a 1.36 million tons per year liquefied natural gas production facility. Launch Date: July 6, 2026. Location: Inner Mongolia. Industry/Project Type: Chemical and pharmaceutical industries / Fuel processing such as petroleum and coal / Modern coal chemical industry; Mineral extraction and processing/Petroleum and natural gas exploration, production, storage, and transportation/Petroleum and natural gas exploration. Project owner: Inner Mongolia Huaxing New Energy Co., Ltd. Total investment: 1,605,810,000 yuan. Current progress: Under construction. Location of construction: Ejin Horoq Front Banner, Ordos City, Inner Mongolia Autonomous Region. Scope of the project: Construction of a natural gas liquefaction facility with a capacity to process 600×104 m3 of coal-derived natural gas per day; this includes one unit for purifying the natural gas at that rate, and two units for liquefying it at a rate of 300×104 m3 per day ; 2 prestressed concrete storage tanks with a total capacity of 80,000 cubic meters, along with the accompanying utility support facilities. Progress milestone: 2026-07-03 – The project is under construction. 2025-06-26 – The approval process for the project proposal has been completed (project proposal approved)
Reply #22026-07-07
【Ten Years of Rapid Development in Chemical Equipment】3183-2026: China’s First Large-Scale Project for Phenol Extraction from Coal Tar – Xinjiang Xuanli’s 100,000 tons/year green phenol extraction project carried out by CCCC. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725540 (Source: Hachuan Chemical Industry Forum (HCBBS))
Reply #32026-07-07
【Common Issues in Haichuan Pipeline Design】-- The stem of the gate valve connecting the outlet pipeline and the inlet pipeline of the hydrogenation unit is installed facing downward. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725261 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-07-09
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Failure to Use Explosion-Proof Wire Glands at the Connections of Power Cables in Explosion-Proof Areas https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725759 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.