HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to select a crane for compressor maintenance

2015-06-02View Original

Thread Content

The hydrogen compressor building requires a maintenance crane; the design specifies the following, which need to be purchased: 1. A double-girder bridge crane, an explosion-proof hook-type bridge crane with a capacity of 12/5 tons, shall be installed in the hydrogen compressor building; 2. The maximum lifting capacity is: 12 tons. 3. The span is: 10.5 meters. 4. The model of the crane beam refers to the national standard atlas 08SG520-3-HDL6-6. Questions: 1. How can this be purchased? 2. Can it be operated manually instead of electrically? 3. Please recommend a few manufacturers. Thank you
Reply #22015-06-02
1. Problems with manufacturers are easy to resolve; this can be done through public online bidding or invited bidding. Manufacturers can be identified online by comparing them with similar companies. 2. For a 12-ton capacity, it’s better to opt for an electric version. 3. We have chosen a model with explosion-proof features; when selecting a manufacturer, it’s important to pay attention to their qualifications and after-sales service, as this will prevent problems down the road. Additionally, the performance records of similar companies should also be taken into consideration
Reply #32015-06-02
This type of maintenance crane is quite common; there are many crane manufacturing factories in Henan; The 12T model should still be electric, but it needs to go through a special inspection ; Manual methods are simple, but they are labor-intensive ;
Reply #42015-06-02
It is highly recommended to choose an electric version; otherwise, maintenance will bring endless troubles
Reply #52015-06-02
The company I worked at before used a manual one! It feels pretty good!
Reply #62015-06-03
Which manufacturer was chosen?
Reply #72015-06-06
Choosing manual mode is exhausting for the maintenance fitter: L
Reply #82015-06-06
1. This is a matter related to design. 2. Procurement is the responsibility of the procurement department. 3. If you want to handle it yourself, please refer to point 1. An electric crane is recommended; the maximum load capacity for maintenance should be 12 tons, so it’s advisable to use a crane with a capacity of 25 tons. The span is also considerable, and using a manual crane would be too labor-intensive
Reply #92015-06-06
You can look for cranes in Xinxiang, Henan – you should go and check it out in person, as there are many crane manufacturers there!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.