HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What is required for instrument inspection, and what is the process?

2015-06-09View Original

Thread Content

During the trial production phase of a project construction, what needs to be reported and registered with authorities such as the Work Safety Supervision Bureau regarding instruments, and what is the process?
Reply #22015-06-09
In accordance with the Metrology Law and quality management requirements, instruments (measuring devices) must be calibrated before use. This is done by submitting them to a qualified metrology calibration institution; they can either be sent there for calibration or the calibration can be carried out on-site. Instruments that are subject to mandatory calibration must be tested by the metrology testing institutions of the quality and technical supervision department.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.