HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Can air cooling be used for duplex steel pipes?

2015-07-14View Original

Thread Content

As the title suggests, I’m facing a problem right now: there’s an order that involves double-phase steel fittings and steel pipes. The factory told me that performing water quenching immediately after heat treatment can lead to welding cracks in the future; therefore, they opt for air cooling or allowing the parts to sit for a while before carrying out water quenching. Is this approach advisable, and will it affect performance? Because I checked the American standards, and they all require water cooling or some other method of rapid cooling.
Reply #22015-07-20
Is there no one to guide me? I’m stuck. . . .
Reply #32015-07-20
:lol:lol:lol:lol I can’t believe it’s a sofa. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.