HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Seeking help with the replacement of pressure gauges and details regarding calibration; those who have participated in skill competitions, please offer some advice

2015-08-19View Original

Thread Content

I. To calibrate a pressure gauge, a piston manometer can be used; however, instead of weights, a standard gauge installed on the pressure gauge can be utilized for calibration, so it’s not very difficult. I would like details on the calibration process: 1. Is it necessary to calibrate the zero point and the full scale? 2. The national standard specifies that a 3-minute voltage withstand test is required at full scale; I would like to know whether this test is carried out when verifying the full scale or at the highest point of the upward movement 3. How does one start the downward movement once the upward movement has reached its peak? 4. What are the errors required for pressure gauge calibration? II. Installing the verified table into the process pipeline 1. Are there any details that need attention?
Reply #22015-08-19
It is necessary to verify the 0 point and full scale. bearded
Reply #32015-08-19
Oh, thank you. I work in the oil production industry, but not in the field of instrumentation
Reply #42015-08-19
When testing or calibrating pressure gauges, the testing regulations JJG 52-2013 \"General Pressure Gauges, Pressure-Vacuum Gauges, and Vacuum Gauges Based on Elastic Elements\" should be followed; these regulations specify the standard requirements as well as the procedures for operation.
Reply #52015-08-19
This post was last edited by lotos1987 on 2015-8-19 20:09. The 0-point and the full-scale point are two points that must be calibrated; they cannot be omitted. In addition, three to five more process points need to be selected between 0 and full scale. Do it once on the upward path of the process point, and do it once as well on the downward path. There are now hand pumps that, after calibration, can be used as standard sources; inflate them once and deflate them once.
Reply #62015-08-26
Thank you so much; it’s very useful information
Reply #72015-08-30
Hehe, bro, you’re not one of the contestants in the 6th Zhanjiang XX Vocational Skills Competition, are you? The timing seems to match a bit. Hehe, just search for the regulations regarding form compilation on Baidu Wenku – there are tons of results. Now that the competition is over, learn it on your own; there will be another chance to compete next year.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.