HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Precautions for replacing the packing on 2\" globe valves – Those who have participated in skill competitions, please share your advice

2015-08-19View Original

Thread Content

What are the things to keep in mind? Just because one does a lot of work regularly doesn’t mean they can grasp the details of exams; I hope someone experienced can give some advice
Reply #22015-08-20
Confirm that the pipeline is not filled with process medium and is in a shut-off state. 1. The existing packing must be cleaned thoroughly. 2. The new packing must be of the same type as the original one, with the same number of layers; in multi-layered connections, the layers should be staggered ; 3. When tightening the screws, do not over-tighten them, and ensure symmetry. I really haven’t done it; I don’t know about anything else.
Reply #32015-08-26
Thank you so much; it’s very useful information!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.