How to manage issues related to contractors’ improper PPE use and construction practices

2015-08-26View Original

Thread Content

The desired goal is that contractors carrying out work in the workshop will act in accordance with the specifications for chemical workshops by wearing PPE properly. It is also understood that this is a management issue; firstly, there should be standards for PPE usage as well as standards for work procedures. The problem lies in execution; so how can we achieve the desired results without imposing any penalties? Dear fellow sailors, I humbly seek your advice and hope you will kindly share your insights
Reply #22015-08-26
It’s still a matter of personal understanding; only by witnessing a disaster firsthand can one truly understand its impact.
Reply #32015-08-26
It’s better to set firm rules and ensure that the basic requirements are met
Reply #42015-08-26
These days, the principle of owner responsibility applies; even in cases related to contractors’ personal protective equipment, if an incident occurs, the owner’s organization is still held accountable~
Reply #52015-08-27
Education should be the main approach, with punishment as a supplementary measure; conduct more inspections, make timely corrections, and help develop good habits
Reply #62015-08-27
1: As explicitly required by the contract service terms. 2: Pre-entry training 3: Inspection. Ordinary contractors are usually quite careful and don’t dare to ignore the owner’s instructions.
Reply #72015-08-27
Routine inspections, photo documentation, fines! ! ! !
Reply #82015-08-27
Routine inspections, photo documentation, fines! ! ! !
Reply #92015-08-29
It’s hard to avoid imposing fines; Our company used to do it this way: first, when signing the contract, we would enter into a relevant safety agreement with the contractor, stipulating that a drilling system would be implemented during the construction process ; Each project comes with a safety card ; Hanged at the construction site ; If on-site safety inspectors identify safety issues ; Make a hole in this card ; (And record the reason for drilling) ; Specify how much cash will be deducted from the project cost for each hole drilled ; The safety card must be returned to the company at the end of each day’s work, and it is stipulated that if the number of holes worked on in a single day exceeds a certain limit ; Everyone needs to stop working to study* ; During the training period, the contractor needs to pay us for the related costs incurred as a result of organizing this training ; And if the progress of construction is affected due to safety regulations*, and losses arise, compensation shall be paid in accordance with the terms of the contract ; If a contractor has too many holes on their safety card, they may lose the qualification to carry out work in our company again ; By implementing this in this way, it gives me the impression that those responsible for safety management are taking proactive steps in managing things ; It’s much easier for us to manage ;

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.