HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Can’t understand the English, please translate it

2015-09-07View Original

Thread Content

5.3.6.4 Bypass 5.3.6.4.1 The interlocks on the low water cutouts shall be permitted to be bypassed only for blowdown purposes. 5.3.6.4.2 The bypass mechanism referred to in 5.3.6.4.1 shall be of a type that remains in place temporarily during blowdown. 5.3.6.4.3 The interlocks shall not be bypassed manually at any time during normal operation.
Reply #22015-09-08
5.3.6.4 Bypass 5.3.6.4.3 The interlock shall not be manually bypassed at any time during normal operation.
Reply #32015-09-09
5.3.6.4 Bypass 5.3.6.4.1 The low water level safety device may be bypassed only for the purpose of draining. 5.3.6.4.2 The bypass mentioned above is only a temporary solution during sewage discharge. 5.3.6.4.4 During normal operation, the interlock must not be bypassed at any time.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.