HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is it necessary to purge with nitrogen when shutting down a chemical liquid processing line?

2015-09-22View Original

Thread Content

Is it necessary to purge with nitrogen when shutting down a chemical liquid processing line? What does it have to do with the length of the production shutdown? I seek guidance from the masters.
Reply #22015-09-22
It depends on what it is. If it’s a chemical liquid that is toxic, flammable, explosive in case of leakage, or requires prolonged storage, then nitrogen must be used.
Reply #32015-09-23
This post was last edited by *aojiaoya0546 on 2015-9-23 20:43. If the equipment is to be parked for a short period of time, there is no need to empty the pipelines; therefore, nitrogen filling is not required. If it is to be parked for an extended period without emptying, it is sufficient to maintain pressure in the equipment (nitrogen is filled when the pressure drops). If emptying is necessary, nitrogen is used to push out the contents — QQ:@@@@@
Reply #42016-01-19
For safety reasons, nitrogen is introduced.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.