Incorrect classification in pressure vessel review drawings

2015-09-26View Original

Thread Content

What are the major errors during the review of pressure vessel drawings? Which ones are technical errors? What are the common mistakes? Personal understanding: Errors such as material selection, welding joint factor, non-destructive testing ratio, whether PWHT is applied, and classification are serious mistakes. What about technical errors?
Reply #22015-09-28
3. Classification of design errors 3.1 Technical errors: refer to major, principled errors. Due to these errors, serious difficulties will arise in areas such as material preparation, manufacturing, installation, production, and maintenance ; It will result in significant design rework ; It will cause safety accidents. For example: (1) It does not comply with relevant laws, regulations, norms, standards, and technical requirements, etc ; (2) Errors in the design basis data, calculation formulas, technical parameters used, or in the calculation results ; (3) The strength, stiffness, and stability of the equipment or its main components are insufficient ; (4) The structure is severely unreasonable. It is inconvenient for manufacturing, installation, transportation, maintenance, and operation; it hinders production, technical safety, and labor protection, resulting in significant waste ; (5) Incorrect selection of material for the equipment or its components ; (6) Incorrect selection of standard diagram, generic diagram, or reusable diagram ; (7) The absence of necessary technical requirements, instructions, notes, etc., or unclear or incorrect requirements, can lead to losses ; (8) Fails to meet process requirements, resulting in significant rework ; (9) Lack of necessary design documents, thereby affecting the issuance of drawings or construction ; (10) It does not comply with the unified regulations of the unit and the project. 3.2 General errors: These refer to carelessness in work that results in mistakes in the detailed aspects of the design; however, they have little impact on material preparation, manufacturing, installation, production, or maintenance, and do not lead to significant rework or losses and waste. For example: (1) Incorrect listing of drawing numbers or titles can result in drawings being sent incorrectly or missing ; (2) The drawings do not conform to mechanical drawing standards and relevant unified regulations, thereby directly affecting construction ; (3) Contradictions and inconsistencies in the drawings will cause difficulties or inconvenience during construction ; (4) The pattern or calculations do not match ; (5) Incorrect or missing numbers and units, missing part numbers, contradictions between overall dimensions and individual dimensions, inappropriate reference surface for dimensioning ; (6) The surface roughness, tolerance fits, geometric tolerances, heat treatment, etc. of general components are inadequately specified or the selected options are not suitable ; (7) The structure is not very reasonable, resulting in waste of materials and labor, as well as difficulties in processing ; (8) Incorrect standard numbers, specifications, or material selection for parts, or unclear markings ; (9) The technical requirements are incomplete or incorrectly specified, with missing necessary explanations ; (10) Significant error in equipment weight calculation (error before the decimal point of at least 20%). 3.3 Drawing errors: refer to errors resulting from poor drafting techniques or low quality in document preparation, but which do not affect manufacturing, installation, or production. For example: (1) Missing dimension lines, cross-section lines, leader arrows, and obvious dimension errors that do not lead to confusion ; (2) The part numbers are incorrect, and the quantity counts are wrong ; (3) Typos or unclear file descriptions, but without causing any misinterpretation ; (4) The sheet size and drawing scale do not meet the requirements; the scale of the drawings is unnecessarily enlarged, or the drawings are not clear enough ; (5) The projections and dashed lines are drawn incorrectly, and the layout of the diagram is highly uneven ; (6) Misuse of tags, incorrect tag names ; (7) The names, specifications, materials, etc. of the components in the details column do not match the corresponding standards, samples, or component drawings ; (8) Other drawing errors.
Reply #32015-10-06
Refer to the book \"Pressure Vessel Design Management System\" published by the Chemical Equipment Association

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.