HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Briefly describe the installation method of the liquid receiving tray for tower equipment?

2015-10-17View Original

Thread Content

Briefly describe the installation method of the liquid receiving tray for tower equipment?
Reply #22015-10-17
1. The liquid receiving tray is installed vertically relative to the tower, with its surface remaining horizontal. 2. The allowable error for the vertical distance K between the liquid dropping plate and the liquid receiving tray is ±3 MM. 3. The allowable error for the distance D between the liquid dropping plate and the vertical edge of the liquid receiving tray is –3 + 5 MM

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.