One question per day; those who answer correctly receive 6 wealth points, while participants receive 2 wealth points; Question 335

2015-10-17View Original

Thread Content

True or False: The lighting system in chemical plant buildings is tested under powered conditions for 24 hours. All lighting fixtures must remain on, and the operating status must be recorded once per hour; no failures should occur during this period of continuous testing. ( ) Answer:√
Reply #22015-10-17
The lighting system in the chemical plant building is operated continuously for 24 hours. All lighting fixtures must remain on, and their operating status should be recorded once per hour; no failures should occur during this continuous testing period. (Yes)
Reply #32015-10-17
The lighting system in the chemical plant building is operated continuously for 24 hours. All lighting fixtures must remain on, and their operating status should be recorded once per hour; no failures should occur during this continuous testing period. (Yes)
Reply #42015-10-17
The lighting system in the chemical plant building is operated continuously for 24 hours. All lighting fixtures must remain on, and their operating status should be recorded once per hour; no failures should occur during this continuous testing period. (Yes)
Reply #52015-10-17
The lighting system in the chemical plant building is operated continuously for 24 hours. All lighting fixtures must remain on, and their operating status should be recorded once per hour; no failures should occur during this continuous testing period. (Yes)
Reply #62015-10-17
The building lighting system is operated continuously for 24 hours after being powered on. All lighting fixtures must remain on, and the operating status should be recorded once per hour; no failures shall occur during this continuous operation period. (√)
Reply #72015-10-18
The lighting system in the chemical plant building is operated continuously for 24 hours. All lighting fixtures must remain on, and their operating status should be recorded once per hour; no failures should occur during this continuous testing period. (Yes)
Reply #82015-10-18
My answer is yes. . . . .
Reply #92015-10-18
Correct, --------------------------the same goes for the main control items

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.