Thread Content
This post was last edited by *aojiaoya0546 on 2015-11-1 20:11. In line with the administrator’s notice encouraging the creation of posts on professional \"basic knowledge\", and with the support of the production area manager yuchenchf, a 【Daily Question】 activity focusing on knowledge related to on-site production management has been launched. Relevant reward: Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. (True/False) After testing the workpieces they have processed to determine whether they are qualified or not, the operator should stack them separately. ( ) Answer:√
After testing the workpieces they have processed to determine whether they are qualified or not, the author should stack them separately. (Correct)
After the operator determines whether the workpiece they have processed is qualified or not through inspection, it should be stacked separately accordingly. ( Right )
After the operator has used testing to determine whether the workpieces they have processed are qualified or not, they should be stacked separately (into separate groups)
After the operator determines whether the workpiece they have processed is qualified or not through inspection, it should be stacked separately accordingly. ( Right )
After the operator determines whether the workpiece they have processed is qualified or not through inspection, it should be stacked separately accordingly. (V )
After the operator determines whether the workpiece they have processed is qualified or not through inspection, it should be stacked separately accordingly. ( Right )
Correct--------------------------------------------------
After the operator determines whether the workpiece they have processed is qualified or not through inspection, it should be stacked separately accordingly. ( √ )