Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. Regarding the on-site quality inspection of project quality, which statement is incorrect? A. The low-strain method is used to detect and assess the integrity of pile shafts. B. Pile foundations with a design grade of Class B must undergo tests to determine their bearing capacity. C. When assessing concrete strength using non-statistical methods, no fewer than 3 groups of concrete samples should be taken. D. To determine the thickness of the reinforcement cover, 1% of the total number of components should be inspected, with a minimum of 5 components being tested. [Production and Management Division] Seeking moderators and technical discussants to join us
Reply #22015-10-26
Regarding the statements on on-site quality inspection of project quality, the incorrect one is (d). A. The low-strain method is used to detect and assess the integrity of pile shafts. B. Pile foundations with a design grade of Class B must undergo tests to determine their bearing capacity. C. When assessing concrete strength using non-statistical methods, no fewer than 3 groups of concrete samples should be taken. D. To determine the thickness of the reinforcement cover, 1% of the total number of components should be inspected, with a minimum of 5 components being tested
Reply #32015-10-26
B. Pile foundations designed for Grade B must undergo pile bearing capacity testing
Reply #42015-10-26
c, I remember the number of concrete test blocks seems to be incorrect
Reply #52015-10-26
D, ------ should be 2%
Reply #62015-10-26
Regarding the statements on on-site quality inspection of project quality, the incorrect one is (D). A. The low-strain method is used to detect and assess the integrity of pile shafts. B. Pile foundations with a design grade of Class B must undergo tests to determine their bearing capacity. C. When assessing concrete strength using non-statistical methods, no fewer than 3 groups of concrete samples should be taken. D. To determine the thickness of the reinforcement cover, 1% of the total number of components should be inspected, with a minimum of 5 components being tested
Reply #72015-10-26
Regarding the statements on on-site quality inspection of project quality, the incorrect one is (D: The thickness inspection of the rebar protection layer should be carried out on 1% of the total number of components, with a minimum of 5 components to be inspected).
Reply #82015-10-26
Regarding the statements on on-site quality inspection of project quality, the incorrect one is (A. The low-strain method is used to inspect and assess the integrity of pile shafts).
Reply #92015-10-26
Regarding the statements on on-site quality inspection of project quality, the incorrect one is (D: The thickness inspection of the rebar protection layer should be carried out on 1% of the total number of components, with a minimum of 5 components to be inspected).
Reply #102015-10-26
I really don’t know,, I just answer questions to earn money. Grit my teeth and take action B
Reply #112015-10-26
Choose D. Reason: The correct statement for option D is that the thickness of the rebar protection layer should be tested by inspecting 2% of the total number of components, with a minimum of 5 components to be tested.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.