This post was last edited by Guan Gongyu on 2015-11-12 at 11:10. [Petroleum Chemical Section] I’m here among my peers – Survey on the basic information of HaiChuan members. Since there is already a notice in the [Petroleum and Chemicals Section] regarding the establishment of a talent pool at http://bbs.hcbbs.com/thread-1253782-1-1.html, this post is temporarily closed. It will be posted once it has been organized. This is done to facilitate communication among members, especially those in the same industry. Following discussions by the Petrochemical Zone management team, a \"Survey on the Basic Information of Petrochemical Zone Members\" will be conducted in the near future. 10 wealth as a reward for replying. Only basic information is required: username + position + years of experience in this position + others. Note: If holding multiple positions, please list the duration for each one separately. For example: In the case of the Guan Gongyu MTBE/butene-1 plant, which has been in operation for 6 years, training was conducted for one year each at two different locations; I was involved in the initial commissioning of this plant. We will compile statistics based on the responses received and summarize them by industry category. To help everyone find peers. Reply in the specified format; a reward of 10 wealth points will be given for the reply. Peer evaluations award a maximum of 1 Wealth per time; please feel free to send flowers as encouragement! For key industry professionals, we recommend joining the Haichuan technology team.
Reply #22015-10-27
Guan Gongyu’s MTBE/Butene-1 plant: 6 years of experience, with one year of training conducted in two different locations; involved in the initial commissioning of this plant
Reply #32015-10-28
ZF201012: From 1996 to 2003, worked as a residue hydrogenation operator for 8 years; participated in numerous start-up/stop-up operations and accident handling. From 2003 to 2005, served as a hydrogen production engineer for 2 years, organizing multiple start-up/stop-up operations. From 2005 to 2006, worked in the scheduling department for 1 year, coordinating the production operations in Area 1. From 2006 to 2008, was part of the start-up team for 2 years, participating in the start-up of new hydrogen production, hydrogenation, and hydrocracking units as well as diesel hydrogenation units. From 2008 to 2013, continued as a hydrogen production engineer for 5 years, organizing multiple start-up/stop-up operations. Since 2013, has been working in safety supervision for 2 years, focusing on joint facility safety management
Reply #42015-10-28
Zhaolijun catalyst unit: 12 years of experience, involved in the initial commissioning and operation of this unit
Reply #52015-10-29
xc445408333 Catalyst Unit Operator (Team Leader): From early 2009 to early 2011 – Participated in multiple times in unit maintenance, as well as in the start-up and shutdown of processes; involved in project construction management. From early 2011 to the end of 2012 – Responsible for the construction of hydrogen production units and coking units; served as the supervisor of the hydrogen production workshop. From early 2013 to July 2013 – Responsible for the initial start-up of the hydrogen production workshop and ensuring safe production operations. Served as the chief engineer for all projects in the branch factory. From August 2013 to August 2015 – Responsible for the technical aspects of all projects in the branch factory, as well as for energy conservation efforts. From September 2015 to the present – Responsible for energy-saving technological upgrades at the head office
Reply #62015-10-29
The last edit to this post was made by Adventure Wang on 2015-10-29 at 09:25. Adventure Wang (in chronological order): Commissioning of the 6 million tons/year atmospheric and vacuum distillation unit – 2 years; Construction and commissioning of the 200,000 tons/year gasoline upgrading unit – 2 years (participation in the construction and commissioning of the 800,000 tons/year diesel upgrading unit, the 1.5 million tons/year diesel hydrogenation unit, and the 20,000 cubic meters/hour hydrogen production unit during external training periods) – 1 year; Construction and commissioning of the 1.9 million tons/year diesel hydrogenation unit, the 40,000 cubic meters/hour hydrogen production unit, and the product refining unit – 1 year
Reply #72015-10-30
A small ant (in chronological order): 750,000 tons per year of crude oil distillation operations started; 5 years have passed. 150,000 tons per year of reforming and semi-regenerative processes started; 2 years have passed. Catalytic cracking operations began after 1 year. Projects for diesel hydrogenation at 2 million tons per year, hydrogen production at 1,000 standard cubic meters per hour, and product refining were initiated; construction of a facility for hydrogenating 400,000 tons of aviation fuel began, with operations starting after that. Projects for hydrogenating 1.2 million tons of gasoline and producing 400,000 tons of gasoline ether also began, with operations starting after their construction
Reply #82015-11-01
He Guangtao: 24123, 350,000 tons/year continuous aromatization unit – 5 years as chief operator; involved in everything from the infrastructure construction, the first start-up and shutdowns, to achieving stable production and normal operation. 800,000 tons/year continuous reforming unit – 6 months of training (at another company); 1,200,000 tons/year continuous reforming unit – currently in the infrastructure construction phase; actively learning about continuous catalytic reforming units (transferred here). . . . . . )
Reply #92015-11-01
Fierce Emperor Diesel Hydroprocessing Unit: 1.5 years; currently under *main operation
Reply #102015-11-02
Riding a snail… SJJ: Combined facility for hydrogen production from natural gas and diesel hydrogenation. I’ve been working here for 1 year and 3 months as a backup process engineer; I’m still a beginner and need to learn a lot from my seniors*

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.