【Daily Question】11.10 Multiple-choice question: Gas analysis must be conducted on towers and storage vessels before hot work is carried out; when the total amount of flammable gases ≯(

2015-11-10View Original

Thread Content

【Daily Question】11.10 Multiple-choice question: Gas analysis must be conducted on towers and storage vessels before hot work; the gas analysis is considered successful when the total amount of flammable gases is ≤ ( ). Answer: C. Please share your opinions! A、0.3% B、0.5% C、1% D、2%
Reply #22015-11-10
Gas analysis must be conducted on towers and container equipment before hot work; the analysis is considered satisfactory when the total amount of flammable gases is ≤ (B, 0.5%).
Reply #32015-11-10
Gas analysis must be conducted on towers and container equipment before hot work; the analysis is considered satisfactory when the total amount of flammable gases ≯ (B).
Reply #42015-11-10
Gas analysis must be conducted on towers and storage vessels before hot work; the analysis is considered satisfactory when the total amount of flammable gases ≯ (C). A、0.3% B、0.5% C、1% D、2%
Reply #52015-11-10
C1%. ------------------------------------------
Reply #62015-11-10
Gas analysis must be conducted on towers and container equipment before hot work; the analysis is considered satisfactory when the total amount of flammable gases is ≤ (B, 0.5%).
Reply #72015-11-10
Gas analysis is considered satisfactory when the total amount of combustible gases ≯ (C, 1%)
Reply #82015-11-10
Gas analysis must be conducted on towers and container equipment before hot work; the analysis is considered satisfactory when the total amount of flammable gases ≯ (A).
Reply #92015-11-10
The ontology can only be B. It should be \"When the lower explosion limit of flammable gases is >4%, an analysis result of <0.5% is considered acceptable.\" ; When the lower explosion limit of the combustible gas is ≤4%, an analysis and testing value of <0.2% is considered acceptable.
Reply #102015-11-10
Gas analysis must be conducted on towers and storage vessels before hot work; the analysis is considered satisfactory when the total amount of flammable gases ≯ (C). A、0.3% B、0.5% C、1% D、2%
Reply #112015-11-10
For Tower B and container equipment, gas analysis must be conducted prior to hot work; the analysis is considered satisfactory when the total amount of flammable gases is ≤ (0.5%).

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.