Are vertical thermosyphon reboilers equipped with valves or orifice plates on the inlet pipe?

2015-12-02View Original

Thread Content

Fractional pressure drop across inlet valve: Specifies the fraction of the total (inlet piping + bundle + outlet piping) pressure drop that occurs in the inlet valve or orifice. Required: No. Units: None. Default: 0 (zero). If you enter a value for this field, the calculated pressure drop will increase by that amount. Inlet valves or orifices are used to prevent instability issues in tube-side thermosiphons. The last sentence mentioned above seems to conflict with the assumption that no valves should be used on the reboiler inlet piping; I would appreciate it if someone could clarify this for me. Thank you!
Reply #22015-12-02
This is generally considered only during the design of process pipelines; based on experience, valves should be installed.
Reply #32015-12-02
Generally, few fittings and valves are installed on the inlet pipes of reboilers, right?
Reply #42015-12-02
This post was last edited by gn_1984 on 2015-12-2 at 15:04. So, won’t you have the boiler inspected or replaced? Adding valves can also facilitate maintenance. I haven’t actually carried out this process, so I’m not too sure; you can go to the process area and ask there. @*lihuagong @maning1984 @haiyangqh @jacques0920
Reply #52015-12-02
I don’t understand! I’ve seen heat exchangers equipped with 2 MOVs at the outlet, used for switching pipelines and things like that. .
Reply #62015-12-03
Adding a valve is a good idea; it facilitates maintenance and allows for shutdown in emergency situations. No orifice plate was seen.
Reply #72015-12-03
Is that how you do it? Are there shut-off valves on both the inlet and outlet pipelines?
Reply #82015-12-03
The main component is a valve, not a shut-off valve, used to prevent leaks in the pipe bundle.
Reply #92015-12-03
It’s not part of the standard design; it’s added later. Once a leak in the tube bundle is detected (mainly to prevent leaks in the shell side), the valve is closed and the issue is addressed on a small scale. This approach is particularly useful when there is a large pressure difference across the shell side.
Reply #102015-12-03
It saves the hassle and prevents the accident from escalating.
Reply #112015-12-03
Even for small-scale treatment, everything has to stop, right?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.