How should equipment professionals in the equipment department of the construction unit review the process packages provided by third parties?

2015-12-03View Original

Thread Content

How should equipment professionals in the equipment department of the construction unit review the process packages provided by third parties?
Reply #22015-12-03
For pure equipment expertise, process package review doesn’t hold much significance; The review of the process package should be carried out from a procedural perspective
Reply #32015-12-03
Since you are a equipment specialist, review the contents related to equipment in the process package from the perspective of equipment requirements
Reply #42015-12-03
Do the equipment personnel review the process package? Check whether the form and structure of the equipment are reasonable, and whether the materials used are appropriate.
Reply #52015-12-03
The process packages are all developed by professional design institutes; I’m afraid we won’t be able to identify any issues either
Reply #62015-12-03
Then why does every newly installed unit have to go through the process package review stage? For the same process unit, different clients may have varying requirements based on their own conditions, and all of these need to be brought to the attention of the design firm during the process package review. As a process unit operates over time, various problems arise, some of which are due to design flaws. As a result, new units that are built later require the design firm to address and improve these existing issues. Moreover, design firms do not spend much effort tracking the operation of a single process unit; since the operating procedures for such units are usually based on a template, it is necessary to inform the design firm of one’s specific needs, while also paying attention to any minor oversights in the process package. For example, the compressors in butyl rubber plants originally used piston ring designs. After several years of operation by various manufacturers, it was found that labyrinth designs were more suitable for those operating conditions. Yet, the process package still specified piston ring designs. In such cases, the client who is installing the new plant must make it clear to the design institute that they want labyrinth designs, and that the design should be modified accordingly. This is precisely the purpose of reviewing the process package – it’s important to handle things properly in advance
Reply #72015-12-04
Based on the PFD, and in reference to the Equipment Data Sheets and Equipment List, the parameters, data, and design conditions of equipment such as reactors, towers, compressors, pumps, and vessels are reviewed.
Reply #82015-12-04
The equipment parameters, data, and design conditions are exactly as stated in the process package; it seems there’s no way to review them. I only noticed that some of the data is incomplete and inconsistent

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.