Welding procedure qualification

2015-12-05View Original

Thread Content

When X70 steel pipes are welded to A105 and A350LF2 flanges respectively, is it necessary to conduct a welding procedure qualification?
Reply #22015-12-05
No, without changing the welding material
Reply #32015-12-06
If X70 material is used, is your project a long-distance pipeline? For long-distance pipelines, the welding procedure qualification shall be carried out in accordance with the standard SY/T0452‑2012 \"Welding Procedure Qualification for Metal Pipelines in Petroleum and Natural Gas Industries\" ; A105, A350 LF2, and X70 belong to the same category but different groups; for welding with A105 and A350 LF2, the welding procedure qualification for X70 can be used without the need for re-qualification.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.