HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Let’s discuss the issues related to the instrument management system

2015-12-15View Original

Thread Content

This post was last edited by guiyu1022 on 2015-12-15 09:31. What is the difference between the \"Instrument Management System\" and the \"Monitoring and Measurement Equipment Management System\"? In my view, all measuring instruments are measurement devices, and all display instruments are monitoring devices; both categories fall under the scope of instrument management. The \"Instrument and Meter Management System\" can be more comprehensive, including control systems as well; therefore, it can essentially cover the functions of the \"Monitoring and Measurement Equipment Management System\", with just a different name. I’m not sure if it’s right?
Reply #22015-12-15
The former mainly involves the classification, maintenance, and calibration of instruments; The latter stage refers to plant-wide monitoring and measurement of the system’s objectives, product quality, as well as safety and the environment. The elements within ISO are inherently interconnected.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.