HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Problems with the wastewater treatment system; seeking expert assistance

2015-12-30View Original

Thread Content

The wastewater treatment system has just been built and is ready to start operating. The process involves: equalization tank – hydrolysis tank – anaerobic tank – aerobic tank – sedimentation tank – sludge treatment system. A trial operation is about to begin, and inoculation and acclimatization are planned to be used. What are the specific precautions to take during startup and the acclimatization phase?
Reply #22015-12-31
During the cultivation process, attention should be paid to the aeration effect for aerobic conditions. For the anaerobic section, not too much attention needs to be paid there; however, it’s better to have an intermediate facultative-fermentation tank between the anaerobic tank and the aerobic tank, as this will be beneficial for the aerobic tank by providing an additional buffer.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.