Thread Content
The Mechanical Category has introduced the 【Daily Question】 feature, which not only fosters an active atmosphere for technical exchanges and guides the direction of such exchanges, but also provides users with financial rewards to help them experience various amazing functions. True or False: Regular blowdown of a boiler refers to carrying out blowdown 1–2 times per week. () Please note: We will close this thread after 24 hours, and at that time we will announce the best reply (the best assistance), as well as the answer and explanation. The competition for \"Active Experts and Weekly Stars\" in the Machinery section has begun: http://bbs.hcbbs.com/thread-1489069-1-1.html. A comprehensive guide to preventing equipment from freezing over winter: http://bbs.hcbbs.com/thread-1502793-1-1.html
Ⅹ I remember it should be scheduled for every day shift
Regular blowdown of the boiler refers to performing blowdown 1–2 times per week. (Mistake)
Regular blowdown of the boiler refers to performing blowdown 1–2 times per week. (Mistake)
Regular blowdown of the boiler refers to performing blowdown 1–2 times per week. (Mistake)
Wrong, if calculated on a weekly basis, it would be congested too.
Happy New Year, Fatso! Regular slag removal from the boiler means removing slag 1–2 times per week. (Incorrect) Depending on the boiler, some require sludge removal per shift, while others require it monthly
Regular blowdown of the boiler refers to performing blowdown 1–2 times per week. (Mistake)