Pressure testing of pneumatic control valves

2016-01-02View Original

Thread Content

Do pneumatic control valves need to undergo pressure testing? I haven’t come into contact with it before; please advise
Reply #22016-01-02
It should be done; the control valves, flow meters (including orifice plates), pressure gauges, and so on that are purchased by our factory are first sent to the instrumentation workshop, from where they are then picked up by the construction team. In some of our factory’s instrument workshops, there are \"experimental classes,\" but often these students are lazy... Especially when it comes to pressure gauges used in the field, they actually don’t conduct any measurements at all.
Reply #32016-01-02
Generally, pressure tests and leakage tests should be conducted on control valves before installation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.