The special care program is the most extensive; relevant workshops, maintenance teams, instrumentation departments, electrical engineering teams, and equipment management departments are all involved in this process. There are requirements regarding maintenance records, and a special care meeting is held once a week. The package mechanism means that one person is responsible.
This post was last edited by ylb913 on 2016-1-4 20:01. Article 43: Responsibilities of the Premium Maintenance Team: (1) To earnestly implement the detailed rules for premium maintenance established by the enterprise, and to carry out premium maintenance work on the large-scale units under their responsibility. (II) Organize joint inspections on a weekly basis and hold regular meetings for top-level maintenance, in order to analyze and assess the operating conditions of large-scale units, propose corrective measures for existing issues, and ensure the safe operation of these units. (III) Responsible for preparing the monthly reports on special maintenance and condition monitoring for large-scale units, and submitting the summary of monthly special maintenance work on time. Article 44: Special Maintenance Meeting (1) The special maintenance meeting is held every Wednesday at 9:00 a.m., chaired by professional engineers from the Maintenance Department. Participants include technical personnel designated by various maintenance units and special maintenance teams, team leaders, supervisors from the Maintenance Department and its professional engineers, as well as supervisors from various maintenance units. (II) The main contents of the special care meeting include the following: ① Each team reports on the results of equipment inspections, operational status, lubricant analysis findings, the operation of utility systems, existing problems, and proposed solutions. ②The professionals from the Maintenance Department report on the status of inspections and provide recommendations regarding operational maintenance precautions. ③Check the inspection records of equipment in various units to understand the status of equipment inspections. ④Discuss the issues existing with the equipment and the handling suggestions put forward by the special care team, to formulate resolution plans ; For major and complex equipment issues, the maintenance unit should first develop a detailed plan for dealing with the fault. After it is discussed and approved by the user unit, the Mechanical Services Department, and the relevant maintenance units, the plan is submitted to higher-level management for approval, after which the Mechanical Services Department carries out the implementation. ⑤Experience in the management of communication equipment, as well as new technologies and management theories. (III) The staff from the Mobility Department are responsible for taking minutes of the Special Care Committee’s meetings and for the archiving of those minutes. Article 45: Inspection of Special Care Equipment (1) The operator shall inspect the equipment every two hours and fill in the shift inspection record ; During inspections, it is mainly checked whether all operating parameters of the equipment are within specified ranges, ensuring compliance with the \"four no’s\" (no overpressure, no overheating, no overspeed, no overload). Report any issues found to the workshop supervisor or technical staff promptly. (II) Maintenance personnel shall conduct inspections on a regular basis once a day; during statutory holidays, the on-duty staff shall carry out inspections daily. Any issues discovered must be reported promptly to the workshop supervisor or technical personnel, and inspection records must be kept ; During inspections, in addition to listening, touching, observing, and smelling, various testing devices are used to check whether the equipment is operating within the specified parameters; equipment defects are carefully identified, and any issues found are addressed promptly. (III) The special care team organizes the technical personnel in the team to conduct joint inspections of the equipment on a regular daily basis, and keeps records of these inspections ; Any change to the joint inspection time must obtain the approval of the professional engineers from the Mobility Department and be reported to the Special Care Committee. (IV) The responsible leader of the using and maintenance unit shall conduct a weekly inspection of the equipment, be responsible for checking the unit’s joint inspection records, and provide feedback. (5) The professional engineers from the Maintenance Department conduct weekly inspections of the equipment, carry out monitoring and analysis of its condition, check the results of joint inspections, and provide their opinions. On a monthly basis, they conduct a comprehensive analysis of the specially monitored equipment units and prepare analysis reports ; In the event of any abnormalities, carry out tracking, monitoring, and analysis, prepare a written report on the equipment’s condition, and report it promptly to higher-level management. Article 46: Management and Archiving of Special Care Records (1) Special care records consist of 5 parts, and the responsibilities for their management and archiving are as follows: … (2) Ensure that the equipment-related records of the unit are properly classified and archived, keeping them complete and in good condition; the retention period for these records shall be the same as the service life of the equipment. (III) Modifications and changes to the special care records must be approved through discussion by the special care committee and signed off by it. Article 47: Inspection and Assessment (1) The Logistics Department conducts monthly assessments on the 20th of each month, based on the implementation and management of special equipment care in various units, in accordance with the requirements of the economic responsibility system, in order to reward those who perform well and hold those who perform poorly accountable. (II) The Maintenance Department conducts a comprehensive evaluation of the equipment every December, prepares an evaluation report, and submits it to the relevant supervisor. (III) The Maintenance Department summarizes the annual top-level maintenance activities in December each year and reports to the annual Equipment Management Meeting.