HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The cooling rate of coked coke is slow; how to solve this?

2016-01-10View Original

Thread Content

This post was last edited by Catalyzing a Grain on 2016-1-14 at 15:53. Slow cooling rate of coker coke – how to solve it?
Reply #22016-01-10
There are several reasons: poor backflow, hesitation to cool down too quickly, to avoid pressure buildup. Due to operational and process-related factors such as low steam injection pressure, low water supply volume, the properties of the oil, small cold coke channels, and so on – there are too many reasons. Your question is too general, making it difficult to provide a response
Reply #32016-01-11
The cooling rate of coked coke is slow; how to solve this? First, may I ask what your coking cycle is? If the coking cycle is long, the cooling rate of the coke will be slower, but this isn’t the main reason. It could be that there isn’t enough time when using low or high steam supply; also, check to see if the downstream path is unobstructed.
Reply #42016-01-15
That’s way too general; please provide some specific details
Reply #52016-01-17
What is the temperature of the cold coke water? Is the volatile content high in petroleum coke?
Reply #62016-01-19
Without an explanation of the phenomenon, it’s impossible to judge
Reply #72016-01-20
We are part of the same unit; one of the reasons is poor backtracking, but that’s not the whole story; For cold coke, from the start of steam injection until all the water is removed and the tower is handed over, the process takes more than 10 hours when it comes to longer cases.
Reply #82016-03-09
The speed of cold coking is primarily determined by the temperature of the coolant exiting the cooling tower at the top; lower temperatures result in slower cold coking. Other factors that influence this process include whether the flare system is functioning properly or if there is pressure buildup, the height of the coke pile, the quality of the coke, and the fact that pelletized coke cools more slowly.
Reply #92016-03-10
Coking in the overhead oil and gas line? There are many factors such as raw material properties, coking cycle, and steam supply time

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.