Thread Content
The last edit to this post was made by Sulfur-Zinc-Aluminum on 2016-1-24 at 08:30. 1. The new regulations stipulated in the \"Announcement on the Access Requirements for the Cement Industry\" require that new cement (clinker) production projects, as well as those undergoing renovation or expansion, be equipped with flue gas denitration systems capable of removing NOx with an efficiency of not less than ( ). New cement projects must also install online emission monitoring devices and use efficient pollution control equipment. A、40% B、50% C、60% D、70% Answer: C
1. The “Announcement on Access Requirements for the Cement Industry” introduces new regulations stating that new cement (clinker) production projects, as well as those undergoing renovation or expansion, must be equipped with flue gas denitration systems capable of removing NOx at an efficiency of not less than (C). New cement projects are required to install online emission monitoring devices and to use efficient pollution control equipment. A、40% B、50% C、60% D、70%
C, 60% ~~~~~~~~~~~~~~~~~~~
The “Announcement on Access Requirements for the Cement Industry” introduces new regulations: new cement (clinker) production projects, as well as those that are renovated or expanded, must be equipped with flue gas denitration systems capable of removing NOx at an efficiency of not less than (C). New cement projects must also install online emission monitoring devices and use efficient pollution control equipment. A、40% B、50% C、60% D、70% Answer: 60%
The “Announcement on Access Requirements for the Cement Industry” introduces new regulations: new cement (clinker) production projects, as well as those that are renovated or expanded, must be equipped with flue gas denitration systems capable of removing NOx at an efficiency of not less than 60%. New cement plants must also install online emission monitoring devices and use efficient pollution control equipment.