HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Environmental Protection Daily Question 1.21: Participate for prizes; 3 correct answers earn an additional 5 prizes

2016-01-21View Original

Thread Content

The last edit to this post was made by Sulfur-Zinc-Aluminum on 2016-1-24 at 08:30. 1. The new regulations stipulated in the \"Announcement on the Access Requirements for the Cement Industry\" require that new cement (clinker) production projects, as well as those undergoing renovation or expansion, be equipped with flue gas denitration systems capable of removing NOx with an efficiency of not less than ( ). New cement projects must also install online emission monitoring devices and use efficient pollution control equipment. A、40% B、50% C、60% D、70% Answer: C
Reply #22016-01-21
1. The “Announcement on Access Requirements for the Cement Industry” introduces new regulations stating that new cement (clinker) production projects, as well as those undergoing renovation or expansion, must be equipped with flue gas denitration systems capable of removing NOx at an efficiency of not less than (C). New cement projects are required to install online emission monitoring devices and to use efficient pollution control equipment. A、40% B、50% C、60% D、70%
Reply #32016-01-21
C, 60% ~~~~~~~~~~~~~~~~~~~
Reply #42016-01-21
The “Announcement on Access Requirements for the Cement Industry” introduces new regulations: new cement (clinker) production projects, as well as those that are renovated or expanded, must be equipped with flue gas denitration systems capable of removing NOx at an efficiency of not less than (C). New cement projects must also install online emission monitoring devices and use efficient pollution control equipment. A、40% B、50% C、60% D、70% Answer: 60%
Reply #52016-01-21
The “Announcement on Access Requirements for the Cement Industry” introduces new regulations: new cement (clinker) production projects, as well as those that are renovated or expanded, must be equipped with flue gas denitration systems capable of removing NOx at an efficiency of not less than 60%. New cement plants must also install online emission monitoring devices and use efficient pollution control equipment.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.