Operations related to the commissioning of the catalytic unit

2016-03-25View Original

Thread Content

How to quickly increase the flow rate of the primary pump when starting up the distillation system? (Discuss through on-site experience)
Reply #22016-03-25
Ensure that the pipeline is filled with diesel in advance, and remove any water present by draining it at low points several times.
Reply #32016-03-25
As a supplementary note, try to open the wall valve as late as possible; opening it too early can allow steam and condensate to enter, resulting in the pump not being able to deliver sufficient flow. The wall valve can be opened before starting the pump.
Reply #42016-03-26
It is sufficient to add a crossover line before the diesel outlet to the inlet of the primary pump.
Reply #52016-04-05
As a supplementary note, the establishment of No. 1 Middle School should not be too early.
Reply #62016-04-05
Ventilate and dehydrate, and add the required amount in a timely manner.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.