HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Tubing issues should be treated as equipment issues

2016-04-11View Original

Thread Content

In the design, since the pipe diameter exceeds 60\", it is specified in the notes that piping should be arranged according to the equipment’s requirements. For example, an 80\" pipe running north-south needs to be connected to an 80\" pipe running east-west. My question is: 1. Since there are no tees in the 80\" size, is it possible to make a hole in the east-west 80\" pipe, provided that the diameter of this hole is smaller than D/2? 2. There are no 80\" elbows; which standard should be used to make such elbows? 3. It’s okay to fasten it at 90 degrees or at a 45-degree angle. 4. What is the center offset of the pipeline when it is fastened?
Reply #22016-04-11
Just do the shrimp bend directly. . . Direct drilling. . .
Reply #32016-04-12
Holes can be drilled directly, and elbows can be made in the shape of dried shrimps

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.