HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

A brief analysis of the acceptance process for belt conveyors

2016-04-25View Original

Thread Content

1. After 24 hours of trial operation, all parameters meet the design requirements or the needs of production, and the conveying equipment is in good condition. The maintenance records are complete and accurate, and the acceptance procedures are carried out in accordance with regulations. 2. For the daily maintenance of belt conveyors, regular inspections should be carried out and corresponding records kept. (1) It is strictly prohibited to start the belt conveyor under load; before operation, the materials on the belt must be checked and removed. (2) Inspect the transmission system and lubricate parts such as reducers and bearings in a timely manner. (3) Check the vibration and temperature of the accessory bearings. (4) Check whether the belt is experiencing issues such as misalignment, slippage, or loose joints; adjustments and repairs may be necessary if such problems exist. (5) Check whether the drum and idlers rotate smoothly. (6) Check whether the frame and all connection points are damaged or loose.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.