HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to simulate the connection points between old and new pipelines in renovation projects

2016-05-04View Original

Thread Content

In a renovation project, there are connecting lines between the inlet and outlet pipelines of the heat exchanger. However, the modification involves only changing the valve at the junction where the inlet pipeline’s connecting line splits into three branches. How should the connection point between the newly installed pipeline and the old pipeline be simulated? Please, experts, help me figure this out!
Reply #22016-05-04
The scope of the modification includes the section up to the valves of the inlet pipelines and connecting lines
Reply #32016-05-05
Simulate to the axial direction of the existing pipelines or their constraint points, to ensure that the impact of the existing pipelines on the new pipelines is reflected in the calculations of the new model.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.