Participation reward: 2 Wealth. Reward for the correct answer: 9 Wealth. According to the specifications for the construction and acceptance of mine shafts, the water leakage rate in the sections of vertical shafts constructed using the freezing method must not be greater than ( ).   A. 0.5m3/h  B. 6 m3/h  C. 15 m3/h  D. 3 m3/h
Reply #22016-05-17
 A. 0.5m3/h 
Reply #32016-05-17
A. 0.5m3/h 
Reply #42016-05-17
According to the specifications for the construction and acceptance of mine shafts and tunnels, the water leakage rate in the shaft sections constructed using the freezing method shall not exceed (  A. 0.5 m3/h ).
Reply #52016-05-17
 A. 0.5m3/h

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.