HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Questions about Petrochemical Regulation 6.4.2 regarding loading and unloading stations?

2016-06-23View Original

Thread Content

Petroleum Industry Regulation 6.4.2 Loading and unloading stations: 1. The distance between the loading/unloading crane positions and the buffer tanks should be no less than 5 meters, while the distance between the elevated tanks should be no less than 0.6 meters. What are buffer tanks and elevated tanks, and what is the purpose of installing them? 2. The distance between the loading/unloading cranes for Class A and B liquids and the pumps that are arranged in a centralized manner should be no less than 8 meters. Question: Does the term \"pumps arranged in a centralized manner\" refer to the discharge pumps or transfer pumps of the storage tanks? Or does it refer to other pumps or pump houses that are not related to the tank area? 3. What is a submersible loading and unloading hose? 4. What is the distance between adjacent duckbill pipes at the same crane position?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.