【Q&A Question 085】2016.07.14

2016-07-14View Original

Thread Content

【Q&A Question 085】July 14, 2016: What items should be checked before liquid removal in a dry gas seal? The answer key will be available after responding; scoring is based on addressing the key points. Monitor the main seal gas flow rate, leakage pressure, flare discharge volume, and secondary seal gas flow rate, and maintain good communication indoors.
Reply #22016-07-14
1. Check the liquid level in the fluid collection tank; 2. Check the dry gas seal system for any leakage points ; 3. Check whether the drainage pathway is unobstructed ; 4. Check the operating condition of the dry gas seal system
Reply #32016-07-14
What are the inspection items before liquid removal in a dry gas seal? Monitor the main seal gas flow rate, leakage pressure, flare discharge volume, and secondary seal gas flow rate, and maintain good communication indoors.
Reply #42016-07-14
Check whether the backflow path for liquid removal is unobstructed?
Reply #52016-07-14
This is a very difficult question to answer. The dry gas used as a sealing medium in our compressors is nitrogen; there is no liquid removal, but the medium itself exists. After cooling at the compressor outlet, there is a liquid separation tank from which the liquid is drained at regular intervals based on the liquid level
Reply #62016-07-14
During the inspection, monitor the main seal gas flow rate, leakage pressure, flare discharge volume, and secondary seal gas flow rate, and maintain good communication indoors.
Reply #72016-07-15
Monitor the main seal gas flow rate, leakage pressure, flare discharge volume, and secondary seal gas flow rate, and maintain good communication indoors.
Reply #82016-07-15
Open all normally open pressure tapping valves in the system, activate on-site pressure gauges, transmitters, pressure switches, level gauges, etc., and inspect all pipelines as well as the connections at the union fittings.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.