HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

16.2 Gas engineering data list

2024-09-23View Original

Thread Content

16.2 Gas engineering information list ├─16.2 Gas engineering general information │ (Construction electrical engineering) Gas equipment maintenance procedures 172 │ 117 Indoor gas pipeline construction technology.txt │ 150th circulating fluidized bed boiler mixed combustion gas system operating procedures.doc │ 50MW gas steam combined cycle power generation project PG6581B---L 1# gas turbine generator unit commissioning outline 55.doc │ 9E gas turbine Chinese and English comparison table.doc │ MS6000B gas turbine unit vibration fault analysis and treatment.doc │ W0310_Gas pipeline leak detection record.xls │ Principle of Liju fifth generation gas condensing vacuum hot water unit.doc │ Rotary kiln gas combustion system training handout.doc │ Rotary kiln air-cooled burner gas combustion system.doc │ Inspection and maintenance system for underground gas pipelines and accessories.doc │ Discussion on the application of cathodic protection technology for urban gas pipelines.doc │ Weisuo gas burner No. 1-11 45 │ Weisuo Gas Burner No. 1-11 (Chinese) 47 │ Indoor gas pipeline installation and construction technology.doc │ Corrosion and protection of household gas stoves.doc │ Implementation of gas metering equipment management specifications.docx │ Selection of flange sealing gaskets in gas systems.doc │ A brief introduction to gas pipeline ball.doc │ Gas and gas filtration systems.doc │ Gas thermal oil furnace system operating procedures │ Commonly used pipes, pipe accessories and materials in gas engineering │ Gas calorific value meter 19 │ Gas burner operating instructions - │ Gas pipeline special manipulator AK-2015 instruction manual.doc │ Gas pipeline ball test record.doc │ Gas turbine generator set start-up and commissioning outline 55 │ Gas turbine body structure 26 │ Gas turbine unit waste heat boiler technology 131 │ Gas turbine specifications 1 │ Summary of ten years of operation of gas turbine air compressor.doc │ Gas gate valve manual.doc │ Introduction to patented products of oil and gas hot blast furnace.doc │ Installation of spherical gas storage tank 18.doc │ DC waste heat boiler solves gas turbine cooling problem 4.doc │ Lecture 1: Basic principles of gas turbines and performance model parameters of 9E gas turbines.doc │ Chapter 2 Industrial Gas Turbine │ Fifth Generation Gas Condensing Vacuum Hot Water Unit.doc │ Chapter 14 Operation Gas Pipeline Inspection │ Selection of Steel Pipes for Water Supply Engineering and Gas Engineering.doc │ Revised Draft of Technical Regulations for Polyethylene Gas Pipeline Engineering in May 2005.doc │ Polyethylene Gas Pipeline Electrofusion Welding Manual Guangdong XX New Building Materials Co., Ltd. │ Putian M701F gas turbine manual (official).doc │ Detailed explanation of "Gas stove failure causes and troubleshooting methods".docx │ Meschli gas engine oil.doc │ Renovation of waste heat boiler water supply system in Jingbian gas power plant.doc │ Design and testing of household straw gas heating boilers in alpine areas.doc │ ├─16.2 Gas Engineering Books │ 2021 Beijing Construction Project Pricing Basis - Budget Consumption Standard General Installation Engineering Volume 10 Water Supply, Drainage, Heating and Gas Engineering │ One picture and one calculation of water supply, drainage, heating, and gas engineering costs 2012 │ Small and medium-sized gas boiler rooms 510 │ Operation and maintenance of small and medium-sized oil and gas boilers 395 │ Russian-Hankian Steam Turbine Gas Turbine Vocabulary 2010 Edition │ The eighth volume of the national unified installation project budget quota, water supply, drainage, heating, and gas engineering GYD-208-2000 (second edition) │ Condensing gas water heater │ Power pipeline design manual volume 3 Gas pipeline Fifth Ministry of Machinery Industry Sixth Design Institute "Power Pipe Design Manual" writing group 1978 edition │ Chemical building installation project budget quota volume 9 water supply, drainage, heating, gas engineering_Compiled by China National Chemical Corporation, China National Chemical Engineering Corporation_2012 │ Introduction to City Gas and Thermal Engineering Editor-in-Chief Huang Yuqiao │ City Gas Basic Tutorial 2012 │ City Gas Application Fundamentals and Practice 2010 Edition │ City Gas Pipeline Network Inspection 2013 Edition │ City Gas Equipment Accident Handling Technology and Its Operation, Maintenance, and Repair Technical Standards Practical Manual │ Selected professional papers on urban gas application compiled by the Application Professional Committee of the Gas Branch of China Civil Engineering Society, Gas Heating Professional Committee, China Municipal Engineering North China Design and Research Institute Co., Ltd., etc. 2016 Edition │ Urban Gas Vocational Education Series Textbooks Urban Gas Dispatching and Monitoring System Editor-in-Chief Liu Yan 2013 Edition │ Urban Gas Polyethylene PE Transmission and Distribution System 2011 Edition │ Urban Gas Transmission and Application Engineering Construction Drawing Design Technical Measures │ Urban Gas Transmission and Distribution Engineering Construction Manual 2018 Edition│ Large Gas-Steam Combined Cycle Power Generation Technology (Mitsubishi F Class) Men Jincheng 2017 Edition│ Large Gas-Steam Combined Cycle Power Generation Equipment and Operation: Maintenance volume high-definition editable text version │ Large gas-steam combined cycle power plant training material DIASYS OVATION control volume 2014 edition compiled by China Society of Electrical Engineering Gas Turbine Power Generation Professional Committee, Shenzhen Energy Group Eastern Power Plant │ Large gas-steam combined cycle power plant training material DIASYSOVATION control volume 2014 │ Large Gas-Steam Combined Cycle Power Plant Training Materials M701F Gas Turbine and Steam Turbine Volume 2014│ Large Gas-Steam Combined Cycle Power Plant Training Material PG9351 Gas Turbine and Steam Turbine Volume 2014│ Large Gas-Steam Combined Cycle Power Plant Training Materials Electrical Volume 2014│ Detailed Examples of Comparing Partial Item Pricing and Budget Fixed Pricing for Installation Engineering Bill of Quantities 3 Second Edition of Water Supply, Drainage, Heating and Gas Engineering Second Edition 2012│ Detailed explanation of examples of comparison between itemized pricing and budget quota pricing for installation engineering bills of quantities Third Edition 2 Based on GB 50856-2003 Water supply, drainage, heating, and gas engineering edited by Zhang Guodong 2015 Edition│ Household Water Heater Reader 2013 Edition│ Municipal Gas Thermal Engineering Common Quality Problems and Solutions 200 Cases 2011 Edition│ Municipal Gas Thermal Constructor's Guide 2010 Edition │ Municipal Gas Thermal Constructor Training Material 2010 Edition │ Questions and Answers on Construction Quality of Building Gas Engineering │ Building Gas Design Manual │ Micro Gas Turbine Power Generation Technology 2012 │ Numerical Simulation Research on the Torch Design and Gas Premixing Process of a Coking Project │ Steam Turbine and Gas Turbine Translation Collection 166 │ Heat Pump Volume 3 Application of Gas Engines and Diesel Heat Pumps in the Construction Industry │ Gas-Steam Combined Cycle Power Generation Equipment and Operation │ Theory and Calculation of Thermal Performance Analysis of Gas-Steam Combined Cycle Power Stations Tsinghua University Academic Monograph 2010 Edition │ Theoretical Basis of Gas-Steam Combined Cycle 589 │ Theoretical Basis of Gas-Steam Combined Cycle 615 │ Introduction and Improvement of Gas and Thermal Engineering Construction Workers 2011 Edition │ Gas supply 2011 edition │ Gas supply engineering │ Gas supply 2nd edition 2011 edition │ Gas cooling, heating and power distributed energy technology application manual 2014 edition │ Gas engineering │ Gas engineering portable handbook │ Gas engineering portable handbook_Compiled by Li Gongfan_2002 │ Gas Engineering and Application Technology │ Gas Engineering Technology and Safety Management: Basic knowledge of gas edited by Li Ming et al. 2012 edition │ Gas engineering technology manual │ Gas engineering construction technology 213 │ Gas engineering design manual Yan Mingqing │ Gas belt crimping (tanking) line technology │ Gas application technology 387 │ Gas application theory and practice 2011 edition │ Gas detection technology manual 2011 edition │ Gas source 2013 │ Fundamentals of Gas Turbine Engines 2014 Edition │ Gas Turbine Propulsion System 2014 Edition │ Gas Turbine Characteristics Analysis and Calculation 2014 Edition │ Gas Thermal Engineering Construction Portable Handbook 409 │ Gas Water Heater Maintenance and Repair 2012 Edition │ Gas Combustion and Application 4th Edition 2011 Edition │ Gas Combustion and Application (Third Edition, 2000) 416 │ Gas Combustion and Application │ Basics of Gas Combustion and Application Technology 198 │ Gas Combustion and Application (Third Edition) 418 │ New Gas Combustion Devices 233 │ Gas Combustion Theory and Practice 233 │ Gas Combustion Equipment 2011 Edition │ Gas Production and Supply 2013 │ Gas Pipeline Engineering Construction 614 │ Compilation of Gas Equipment Operation and Maintenance Procedures 239 │ Gas turbine and its new development 63 │ Gas turbine power generation device and application 253 │ Gas turbine power plant installation and operation technology 2013 │ On-site standard operation instructions for gas turbine generator operators Shuwangting Power Plant 2015 edition │ Gas turbine combustion chamber │ Gas turbine design 380 │ Gas turbine design basics (1987) 325 │ Gas turbine operation attendant Gas Transmission and Distribution Engineering Technical Manual Zhang Zhixian │ Gas Transmission and Distribution (Second Edition) 312 │ Oil and Gas Boiler 720 │ Oil and Gas Boiler Practical Technology 252 │ Oil and Gas Boiler Room Design Manual 790 │ Oil and Gas Boiler Room Design Manual 2nd Edition 2013 Edition │ Oil and Gas Boiler Structural Design and Picture Book │ Oil and Gas Boiler Operation and Management 279 │ Practical Manual on Selection, Installation, Operation and Maintenance of Oil-fired Boilers and Coal-fired Boilers, Oil and Gas Transformation Technology 1820 │ Modern Gas Turbine Technology 368 │ Introduction to Power Plant Gas Turbines 2014 │ Chapter 6 New Technologies, New Techniques and New Standards for Gas Pipeline Construction 225 │ Pipeline Engineering Construction Documents Manual for Water Supply, Drainage, Heating and Gas Edited by Wang Lixin, 2015 Edition │ Common cases in pipeline engineering design and construction and prevention of water supply and drainage, heating, gas supply and petrochemical pipelines │ Common cases in pipeline engineering design and construction and prevention of water supply and drainage, heating, gas supply and petrochemical pipelines 2011 edition │ Water supply, drainage, heating and gas engineering pricing applications and examples edited by Du Guicheng 2017 edition │ Water supply, drainage, heating and gas engineering budget manual 2nd edition edited by Zhang Guodong 2014 edition │ Bill of Quantities Valuation Application Manual for Water Supply and Drainage, Heating, and Gas Engineering Projects Corresponds to GB50500-2008 2010 Edition│ Use and Maintenance of Electrical Appliances for Comfortable Home Water Systems Water Heaters and Water Purifiers 2014│ 100 English-Chinese Gas Turbine Device Vocabulary│ Easily learn and repair household water heaters Electric Water Heaters·Gas Water Heaters·Solar Water Heaters·Air Energy Water Heaters 2012│ Steel Enterprise Gas Engineering Design Manual │ Steel Enterprise Gas Design Reference Materials (Gas Part) │ High Efficiency, Low Carbon and Environmentally Friendly Large Gas Turbine Power Plant Engineering Practice Technology │ Recommended Textbook Planned and Recommended by the Professional Steering Committee for Architectural Environment and Energy Application Engineering in Universities, Fifth Edition of Gas Transmission and Distribution, 2015 Edition edited by Duan Changgui │ ├─16.2 Gas Engineering Drawings │ General Drawing of 2T Gas Boiler.dwg │ 40t gas boiler general drawing.dwg │ 45T gas boiler.dwg │ 7MW natural gas hot water boiler general drawing.dwg │ 90t gas boiler complete set of electrical drawings.dwg │ Wall-mounted boiler gas water heater general drawing.dwg │ Industrial gas boiler room installation and construction drawing-Sichuan Tuopai Pharmaceutical.dwg │ Civil gas boiler - Zhujiang Junjing Home.dwg │ Summary of civil gas boiler room drawings - Beijing Zhujiang Roman Garden.dwg │ Gas stove.dwg │ Gas infrared radiation heating design drawing.dwg │ Gas boiler general drawing.dwg │ Gas boiler room.dwg │ Gas gate valve.dwg │ ├─16.2 Gas Engineering Atlas │ 02R110 Gas (Oil) Boiler Room Engineering Design and Construction Drawings.exe │ 02R110 Gas (Oil) Boiler Room Engineering Design and Construction Drawings │ 03K501-1 Gas Infrared Radiation Heating System Design, Selection, Construction and Installation │ 05N6 Gas Engineering │ 05R502 Gas Engineering Design and Construction Drawings (Energy Guide CAD) │ 05 Series Building Standard Design Atlas 05N6 Gas Project│ 12YN2 Gas (Oil) Heating Boiler Room Project│ 15K401-2 Design, Selection, Construction and Installation of Unit Gas Infrared Radiation Heating System│ 18GL501 Comprehensive Pipe Gallery Gas Pipe Laying and Installation│ 18GL502 Comprehensive Pipe Gallery Gas Pipe Cabin Supporting Facilities Design and Construction│ DBJT02-22-09 98 Series Building Standard Design Atlas---Gas Engineering │ Municipal Engineering Design and Construction Series Atlas 3 Gas and Heating Engineering (Volume 1 and 2) │ Xinjiang Gas Group Gas Engineering Construction Atlas │ Yu18M02 Chongqing Comprehensive Pipeline Pipeline (Water Supply and Drainage, Electricity, Communications, Gas) Standard Design Atlas DJBT50-116 │ Gan 02D401 Installation of three residential water, electricity and gas meters│ Shaanxi 2021TJ 054 General Atlas of Gas Pipeline Engineering│├─16.2 Gas Engineering Local Industry Enterprises * * Legal regulations │ Classification of pipelines in urban gas transmission and distribution systems and regulations on the use of materials Steel pipe part China Municipal Engineering Northwest Design Institute Co., Ltd. Zhengzhou Gas Management Regulations Zhengzhou Gas Management Regulations Implementation Rules Publicity Manual 2003 Edition │ ├─16.2 Gas Engineering Standard Specifications │ CECS 131-2002 Technical Regulations for Buried Steel Skeleton Polyethylene Composite Pipe Gas Pipeline Engineering │ CECS 134-2002 Design Regulations for Domestic Hot Water Supply of Fuel and Gas Hot Water Units │ CECS 264-2009 Technical regulations for construction gas aluminum-plastic composite pipe engineering with additional provisions│ CECS 461-2016 Technical regulations for double compression-connected stainless steel gas pipelines│ CGAS draft general technical requirements for civil smart gas meters│ CJ 131-2001 General rules for the structure of household gas burning appliances│ CJJ 12-2013 Regulations for the installation and acceptance of household gas burning appliances│ CJJ 145-2010 Technical Regulations for Gas Combined Cooling, Heating and Power Engineering│ CJJ 33-2005 Specifications for Construction and Acceptance of Urban Gas Transmission and Distribution Projects│ CJJ 63-2018 Technical Standards for Polyethylene Gas Pipeline Engineering│ CJJ 94-2009 Specifications for Construction and Quality Acceptance of Urban Gas Indoor Projects│ CJJ 95-2013 Technical Regulations for Corrosion Control of Buried Steel Pipelines for Urban Gas│ CJJT 130-2009 Gas Engineering Drawing Standards│ CJJT 147-2010 Technical Regulations for Trenchless Repair and Update Engineering of Urban Gas Pipelines│ CJJT 148-2010 Technical Regulations for Odorization of Urban Gas│ CJJT 153-2010 Standard for Urban Gas Labeling│ CJJT 215-2014 Technical Specifications for Leak Detection of Urban Gas Pipeline Networks│ CJJT 216-2014 Technical Specifications for Gas Heat Pump Air Conditioning System Engineering│ CJJT 250-2016 Technical Specifications for Urban Gas Pipeline Crossing Engineering│ CJJT 259-2016 Technical Specifications for Urban Gas Automation Systems│ CJJT 268-2017 Intelligent technical specifications for urban gas engineering│ CJT 112-2008 IC card diaphragm gas meter│ CJT 113-2015 Gas heater│ CJT 125-2014 Steel skeleton polyethylene plastic composite pipe and fittings for gas│ CJT 132-2014 Self-priming valve for household gas burning appliances│ CJT 157-2017 Coated tempered glass panel for household gas stoves│ CJT 180-2014 Manual gas valve for construction│ CJT 182-2003 Buried hole mesh steel belt polyethylene composite pipe for gas│ CJT 187-2013 Gas steamer│ CJT 197-2010 Stainless steel corrugated hose for gas appliance connection│ CJT 222-2006 Conformity assessment procedures and inspection rules for household gas burning appliances│ CJT 28-2013 Chinese gas stoves and cooking stoves│ CJT 29-2019 Gas water boilers│ CJT 305-2009 Ceramic panels for household gas stoves│ CJT 3069-1997 Urban gas measurement units and symbols│ CJT 336-2010 Condensing household gas instant water heater │ CJT 341-2010 Mixed light hydrocarbon gas │ CJT 347-2010 Household gas alarm and sensor │ CJT 385-2011 Urban gas lightning protection connector │ CJT 392-2012 Cooking gas large cooker │ CJT 393-2012 Household gas appliance plug valve assembly│ CJT 394-2012 Electromagnetic gas emergency shut-off valve│ CJT 394-2018 Electromagnetic gas emergency shut-off valve│ CJT 395-2012 Condensing gas heating bath dual-purpose furnace│ CJT 398-2012 Electronic gas and air proportional adjustment device for household gas appliances │ CJT 421-2013 Electronic controller for household gas burning appliances │ CJT 435-2013 Aluminum alloy plastic-lined composite pipes and fittings for gas │ CJT 447-2014 Pipeline gas self-closing valve │ CJT 448-2014 Town gas odorizing device │ CJT 449-2014 Cut-off diaphragm gas meter│ CJT 450-2014 Pneumatic gas and air proportional adjustment device for gas burning appliances│ CJT 451-2014 General technical conditions for commercial gas burning appliances│ CJT 466-2014 Stainless steel pipes and double-pressed pipe fittings for gas transmission│ CJT 469-2015 Heat exchangers for gas water heaters and heating furnaces │ CJT 477-2015 Ultrasonic gas meters │ CJT 479-2015 General technical principles for gas burning appliances laboratories │ CJT 490-2016 Metal-coated hoses for connecting gas appliances │ CJT 491-2016 Rubber composite hoses for connecting gas appliances │ CJT 503-2016 Wireless remote diaphragm gas meter│ CJT 513-2018 Material classification and coding of urban gas equipment│ CJT 514-2018 Metal valves for gas transmission│ CJT 515-2018 Gas boiler flue gas condensation heat energy recovery device│ DB11T 1136-2014 Regulations for the construction and acceptance of the inverted lining method of urban gas pipelines (2) │ DB11T 1136-2014 Regulations for the construction and acceptance of the inverted lining method of urban gas pipelines │ DB11T 1231-2015 Energy saving monitoring of gas industrial boilers │ DB11T 759-2010 Technical regulations for the operation of gas steam boilers for heating │ DB11T 760-2010 Technical regulations for operation of gas hot water boilers for heating│ DB13(J)T 8061-2019 Construction quality acceptance standards for urban gas pipelines and equipment installation projects│ DB13T 1652-2012 Supervision and inspection rules for manufacturing of buried polyethylene (PE) pipe fittings and valves for gas│ DB13T 2862-2018 Specifications for the installation and use of household gas alarms│ DB15T 1819.1-2020 Technical Specifications for Ultrasonic Phased Array Inspection of Welded Joints of Buried Polyethylene Pipelines for Gas Part 1: General Requirements│ DB15T 1819.2-2020 Technical Specification for Ultrasonic Phased Array Inspection of Welded Joints of Buried Polyethylene Pipelines for Gas Part 2: Electrofusion joint inspection │ DB15T 1819.3-2020 Technical specifications for ultrasonic phased array inspection of welded joints of buried polyethylene pipelines for gas use Part 3: Hot melt joint inspection │ DB21T 3486-2021 Periodic inspection rules for buried polyethylene gas pipelines │ DB22T 2875-2018 Management specifications for urban gas pipelines │ DB31T 1058-2017 Phased array ultrasonic testing of welded joints of polyethylene (PE) pipelines for gas │ DB31T 1162-2019 Technical rules for periodic inspection of gas polyethylene pipelines │ DB33T 730-2009 Quality requirements for copper valves in gas pipelines │ DB34T 2032-2013 Residential pipeline gas service specifications │ DB34T 3193-2018 X-ray inspection and evaluation of butt welds of PE pipelines for gas │ DB37T 3701-2019 Periodic inspection rules for polyethylene gas pipeline welding equipment.doc │ DB37T 3702-2019 Periodic inspection rules for in-service buried polyethylene gas pipelines.doc │ DB41T 1825-2019 Welding process evaluation of polyethylene pipelines for gas use │ DB42T 1051-2015 Gas aluminum alloy plastic-lined (PE) composite pipeline engineering technical regulations │ DB42T 1144-2016 Specifications for the installation and acceptance of stainless steel corrugated hoses for gas│ DB42T 750-2011 Specifications for quality evaluation of installation and maintenance services for household gas burning appliances│ DB43T 1169-2016 Specifications for the installation of combustible gas detection and alarm devices in public places│ DB4401T 41-2020 Specifications for periodic inspection of municipal gas pipelines│ DB44T 1374-2014 Test method for tearing and peeling of electrofusion joints of polyethylene pipes for gas use│ DB44T 1992-2017 Rules for periodic inspection of polyethylene pipe welding equipment for gas use│ DB44T 2033-2017 Rules for periodic inspection of polyethylene gas buried pipelines in use│ DB44T 402.1-2007 Gas water heater (feed) and exhaust pipes│ DB44T 402.10-2007 Proportional regulating valve for household gas appliances│ DB44T 402.2-2007 Electronic controller for household gas appliances│ DB44T 402.3-2007 Temperature controller for household gas instant water heaters│ DB44T 402.4-2007 Fan assembly for household gas instant water heaters│ DB44T 402.5-2007 Self-priming solenoid valve for household gas appliances│ DB44T 402.6-2007 Burner for household gas instant water heaters│ DB44T 402.7-2007 Heat exchanger for household gas instant water heaters│ DB44T 402.8-2007 Air pressure switch for household gas instant water heaters│ DB44T 402.9-2007 Household gas instant water heater water-gas linkage valve│ DB51T 1357-2011 Specifications for the construction and acceptance of low-pressure biomass gas pipeline network projects│ DB51T 1377-2011 Specifications for the construction and acceptance of low-pressure biomass gas indoor projects│ DB51T 1377-2020 Specifications for the construction and acceptance of low-pressure biomass gas indoor projects│ DB61T 1389-2020 Technical specifications for risk assessment of polyethylene pipelines for urban gas│ DB61T 1390-2020 Regular inspection rules for polyethylene pipelines for urban gas│ DB61T 969-2015 Supervision and inspection rules for the installation of polyethylene pipelines for gas│ DB65T 3251-2020 Cleaner Production Standard Gas Power Generation Industry│ DB65T 4242-2019 Technical Specification for Gas Boiler Partition Flue Gas Waste Heat Recovery and Utilization│ DB65T 4243-2019 Technical Specification for Gas Boiler Flue Gas Recirculation and Nitrogen Reduction│ DBJ 46-054-2020 Hainan Province Rural Pipeline Gas Engineering Construction and Operation Management Standard│ DBJ08-46-1995 Installation design standards for gas box-type pressure regulating stations│ DBJT 15-39-2005 Fire protection design specifications for gas direct-fired unit rooms│ DGJ08-74-2004 Engineering technical regulations for gas-fired direct-fired absorption hot and cold water units│ DGJ08-74-2020 Engineering technical standards for gas-fired direct-fired absorption hot and cold water units│ DGJ08-80-1999 Technical Specifications for Polyethylene Buried Gas Pipeline Engineering│ DGJ32C04-2007 Jiangsu Province Urban Gas Service Quality Standard.doc │ DGTJ 08-2012-2018 Gas Pipeline Facilities Marking Application Regulations│ DGTJ 08-2031-2007 Urban Gas Pipeline Engineering Construction Quality Acceptance Standard│ DLT 1123-2009 Configuration of production safety facilities of thermal power generation enterprises 6 Specifications for configuration of safety facilities of gas-steam combined cycle generating units 6.3 Other safety facilities checklist.doc │ DLT 1699-2017 Specifications for installation and acceptance of waste heat boilers of gas-steam combined cycle units │ DLT 1749-2017 Guidelines for manufacturing supervision of waste heat boilers of gas-steam combined cycle units │ DLT 1750-2017 Inspection and maintenance procedures for horizontal natural circulation waste heat boilers of gas-steam combined cycle units│ DLT 1925-2018 Inspection, operation and maintenance procedures for thermal automation systems of gas-steam combined cycle units│ DLT 5174-2020 Design specifications for gas-steam combined cycle power plants│ GB 11375-1999 Safety in thermal spraying operations of metal and other inorganic coatings 5. Safe operation of thermal spray equipment 5.1 Storage, transportation and use of oxygen and gas bottles 5.1.3 Checklist.doc │ GB 11375-1999 Safety in thermal spraying operations of metal and other inorganic coatings 5. Safe operation of thermal spray equipment 5.1 Storage, transportation and use of oxygen and gas bottles Checklist.doc │ GB 15322.1-2019 Combustible gas detectors Part 1 Point type combustible gas detectors for industrial and commercial purposes│ GB 15322.2-2019 Combustible gas detectors Part 2 Household combustible gas detectors│ GB 15322.3-2019 Combustible gas detectors Part 3 Portable combustible gas detectors for industrial and commercial purposes│ GB 15322.4-2019 Combustible gas detectors Part 4 Linear beam combustible gas detectors for industrial and commercial purposes │ GB 16410-2020 Household gas stoves │ GB 16808-2008 Combustible gas alarm controllers │ GB 17905-2008 Safety management rules for household gas burning appliances (2) │ GB 18111-2021 Gas volumetric water heaters │ GB 25034-2020 Gas-fired heating and water heaters│ GB 25035-2010 Dimethyl ether for urban gas use│ GB 26255.1-2010 Mechanical pipe fittings for polyethylene piping systems for gas use Part 1: Steel-to-plastic conversion fittings for pipes with a nominal outer diameter not exceeding 63 mm │ GB 26255.2-2010 Mechanical fittings for polyethylene piping systems for gas use Part 2: Steel-plastic conversion fittings for pipes with a nominal outer diameter greater than 63mm│ GB 27790-2020 Town gas pressure regulators│ GB 27791-2020 Town gas pressure regulator boxes│ GB 29993-2013 Technical conditions for rubber and plastic hoses and hose assemblies for household gas use│ GB 50028-2006 (2020 edition) Urban gas design specifications│ GB 50032-2003 Seismic design specifications for outdoor water supply, drainage and gas thermal engineering│ GB 50494-2009 Urban gas technical specifications│ GB 50973-2014 Combined cycle unit gas turbine construction and quality acceptance specifications│ GB 55009-2021 Gas engineering project specifications│ GB 6932-2015 Domestic gas instant water heaters│ GBT 11348.4-2015 Mechanical vibration measurement and evaluation of vibration of machines on rotating shafts Part 4: Gas turbine units with sliding bearings │ GBT 11371-2008 Use and maintenance of light gas turbines │ GBT 13295-2019 Ductile iron pipes, fittings and accessories for water and gas │ GBT 13611-2018 Classification and basic characteristics of urban gas │ GBT 13674-1992 Specifications for the use of fuel for light gas turbines │ GBT 13675-1992 Light gas turbine transportation and installation│ GBT 14098-2020 Simple method for measurement of airborne noise in gas turbines and gas turbine units│ GBT 14411-2008 Light gas turbine control and protection system│ GBT 15135-2002 Gas turbine vocabulary│ GBT 15558.1-2023 Buried polyethylene (PE) piping system for gas use Part 1: General │ GBT 15558.2-2023 Buried polyethylene (PE) piping system for gas use Part 2: Pipes│GBT 15558.3-2023 Buried polyethylene (PE) pipeline systems for gas use Part 3: Pipe fittings │ GBT 15558.4-2023 Buried polyethylene (PE) piping system for gas use Part 4: Valves │ GBT 15558.5-2023 Buried polyethylene (PE) piping systems for gas use Part 5: System applicability │ GBT 15736-2016 General technical requirements for gas turbine auxiliary equipment │ GBT 16411-2008 General test methods for household gas appliances │ GBT 16637-2008 General technical requirements for light gas turbine electrical equipment │ GBT 18345.2-2001 Gas turbine flue gas emissions Part 2 Automatic monitoring of emissions │ GBT 19839-2005 General technical conditions for industrial oil and gas burners│ GBT 20936.1-2017 Gas detectors for explosive environments Part 1: Performance requirements for combustible gas detectors│GBT 20936.4-2017 Gas detectors for explosive environments Part 4: Performance requirements for open path combustible gas detectors │ GBT 22069-2008 Gas engine driven air conditioning (heat pump) units │ GBT 26002-2010 Stainless steel corrugated hoses and fittings for gas transmission │ GBT 26255.2-2010 Mechanical fittings for polyethylene piping systems for gas use Part 2: For pipes with a nominal outer diameter greater than 63mm│GBT 26794-2011 Counters for diaphragm gas meters│GBT 28686-2012 Gas turbine thermal performance test│GBT 28885-2012 Gas service guidelines│GBT 30577-2014 Gas-steam combined cycle waste heat boiler technical conditions│GBT 30824-2014 Test method for temperature uniformity of gas heat treatment furnace│ GBT 30840-2014 Basic technical conditions for gas bell annealing furnace│ GBT 32434-2015 Hot melt docking procedure for polyethylene (PE) pipes and fittings used in plastic pipes and fittings for gas and water distribution systems│ GBT 33199.1-2016 Mechanical Vibration Rotating Machinery Torsional Vibration Part 1: Turbines and gas turbine generator sets installed on land above 50MW│GBT 33349-2016 General technical conditions for reciprocating internal combustion gas power station systems│GBT 34537-2017 Compressed hydrogen and natural gas mixed gas for vehicles│GBT 34576-2017 Specifications for steam turbines for gas-steam combined cycle│GBT 35073-2018 Gas burner energy saving grade evaluation method │ GBT 35075-2018 Gas burner energy saving test rules │ GBT 35529-2017 Rubber diaphragm for urban gas pressure regulator │ GBT 36051-2018 Gas filter │ GBT 36242-2018 Gas flow meter volume correction instrument │ GBT 36263-2018 Urban gas symbol and measurement requirements │ GBT 37296-2019 Safety design specifications for reciprocating internal combustion gas power stations │ GBT 37580-2019 Life cycle requirements for polyethylene (PE) buried gas pipeline corrosion control engineering │ GBT 38179-2019 Requirements for gas turbine applications in power generation equipment │ GBT 39841-2021 Ultrasonic gas meter│ GBT 40370-2021 Calculation method for energy consumption indicators of gas-steam combined cycle cogeneration│ GBT 40739-2021 Data collection and trend monitoring system requirements for gas turbine gas turbine equipment│ GBT 41320-2022 Non-domestic gas heaters│ GBT 42169-2022 Green product evaluation Household gas appliances │ GBT 50680-2012 Clear version of basic terminology standards for urban gas engineering │ GBT 51455-2023 Construction and acceptance standards for urban gas transmission and distribution projects │ GBT 6075.4-2015 Mechanical vibration measurement on non-rotating parts to evaluate the vibration of the machine Part 4: Gas turbine unit with sliding bearing│ HG 2807-1996 Rubber diaphragm for urban gas pressure regulator│ HGT 3661.2-2016 Propane for industrial gas cutting and welding│ HJT 287-2006 Environmental protection product technical requirements for small and medium-sized oil and gas boilers│ JBT 11032-2010 Technical conditions for gas turbine compressor wheel stainless steel forgings│ JBT 11226-2011 Baking mechanical layer gas oven│ JBT 11265-2012 Gas waste heat boiler flue gas denitration technical equipment│ JBT 11491-2013 Skid-mounted gas pressure reducing device│ JBT 11492-2013 Copper ball valves and stop valves for gas pipelines│ JBT 12958-2016 Household ultrasonic gas meters│ JBT 13567-2018 Thermal mass gas meters│ JBT 13728-2019 Gas pressure regulating valves for medium and large power gas engines│ JBT 13956-2020 Gas tanks for gas-powered nail guns│ JBT 6907-2005 Gas motorcycle compressor│ JBT 7822-1995 General technical conditions for gas turbine electrical equipment│ JBT 8953.1-1999 Basic information on procurement of gas-steam combined cycle equipment│ JJF (new) 17-2018 Calibration specification for online methanol combustible gas alarm device│ JJF (Ji) 214-2023 Calibration Specifications for Household Combustible Gas Detectors│ JJF (New) 29-2019 Local Calibration Specifications for Point Type Combustible Gas Detectors│ JJF (New) 30-2019 Local Calibration Specifications for Combustible Gas Leak Detectors│ JJG (Ji) 156-2019 Vehicle-mounted CNG Gas Device Pressure Instruments│ JJG (New) 25-2021 Wet gas flow meter diaphragm gas meter calibration device│ NBT 10301-2019 Reciprocating internal combustion gas generator set thermal balance test method│ NYT 3898-2021 Biomass pyrolysis gas quality evaluation│ QCT 755-2020 Liquefied natural gas vehicle gas system technical conditions│ QJ 3166-2003 Combined test method for liquid oxygen kerosene engine turbine pump and gas generator│ QSY 1479-2012 Technical specifications for gas turbine centrifugal compressor unit installation engineering│ SHCC-1ENG-PP-001-0506 Shenhua unified technical regulations for storage and transportation of combustible gas emission systems│ SHCTO-1ENG-PP-001-0506 Shenhua unified technical regulations for storage and transportation of combustible gas emission systems│ SHT 1768-2009 Polyethylene (PE) special materials for gas pipeline systems│ SYT 0440-2021 Technical specifications for industrial gas turbine installation│ TCCES 24-2021 Technical specifications for urban gas pipeline network leakage assessment│ TCECS 10007-2018 Gas heating water heaters and burners for water heaters│ TCECS 10012-2019 Gas heating water heaters and water circuit components │ TCECS 10105-2020 Commercial gas fully premixed condensing water heaters │ TCECS 10127-2021 Fans for gas burning appliances │ TCECS 215-2017 Technical regulations for the application of gas heating water heaters │ TCECS 518-2018 Technical regulations for the application of dimethyl ether for urban gas│ TCECS 519-2018 Technical regulations for the application of gas heaters│ TCECS 583-2019 Technical regulations for the application of commercial gas burning appliances│ TCECS 633-2019 Technical regulations for stainless steel corrugated hoses in gas user engineering│ TCGAS 001-2016 Technical regulations for the connection of wide-side pipe fittings and coated gas pipelines│ TCGAS 003-2017 General technical requirements for civil smart gas meters│ TCGAS 004-2018 Technical standards for gas supply from small propane storage tanks│ TCGAS 005-2018 Technical regulations for inserting optical fiber casing in gas pipelines│ TCGAS 006-2019 Smart gas meter reading system based on narrowband Internet of Things (NB-IoT) technology│ TCGAS 007-2019 General technical requirements for non-civilian smart gas meters │ TCGAS 008-2020 Technical regulations for stainless steel integrated pipelines for gas │ TCGAS 009-2020 Urban gas signs │ TCGAS 010-2020 Technical regulations for trenchless repair and update projects of urban gas pipelines │ TCGAS 011-2020 Electronic temperature and pressure correction diaphragm gas meters │ TCGAS 012-2021 Technical Regulations for Gas Art Torch and Fire Special Effects System│ TCGAS 013-2021 Combustible gas monitoring device in underground wells│ TCGAS 016-2021 Press-fit coated carbon steel pipes and fittings for gas│ TCGAS 018-2021 Hot-dip galvanized steel pipes for gas│ ZJM-030-4324-2020 Electromagnetic gas proportional valve│ ├─16.2 Gas Engineering Calculation Software │ Gas Boiler Thermal Calculation (Three Returns) 97.xls │ Gas Boiler Calculation. Design and implementation of 130TH gas boiler automatic control system │ 9FA gas turbine requirements for natural gas fuel quality 5 │ Analysis of old and new standards of CJT180 manual gas valve │ GC378NE gas-powered hydraulic excavator gas power system │ M701F gas turbine control system analysis │ MHI 701F gas turbine combined cycle waste heat boiler technical characteristics │ Promotion and application of PE gas pipelines and PE ball valves in gas engineering │ Research on PE gas pipeline application technology │ Research on PE gas valve welding process parameters │ A simple medium-pressure gas pipeline drainage device │ Prospects of China's gas-steam combined cycle power generation 9 │ China's West-East Gas Pipeline Project - GE gas turbine and compressor unit selected │ China's West-East Gas Pipeline Project selected GE gas turbine and GE compressor unit │ GE gas turbines and compressor units were selected for China's West-East Gas Pipeline Project │ The Chinese Academy of Sciences successfully developed a new gas monitoring system │ Feasibility study of dimethyl ether as urban gas │ Application prospects of dimethyl ether in the urban gas field │ Gas adaptive control of fully premixed condensing gas wall-hung boilers │ Controllable gas valve design scheme │ Setting up of combustible gas and toxic gas detectors in chemical plants │ Application of combustible gas detection alarms │ Application and layout principles of combustible gas probes on offshore platforms │ Analysis of plastic limit load of gas bends with pitting defects │ Development status and prospects of domestic and foreign gas turbine power generation technology │ Foreign gas-steam combined cycle steam turbines │ Corrosion protection of medium-pressure gas steel pipelines in service │ Issues and protection measures for the distance between buried PE gas pipelines and heating and insulation pipelines │ Design of sacrificial anode cathodic protection for buried steel gas pipelines │ Practice of additional forced current cathodic protection for buried steel gas pipelines │ Investment types and risk control of gas projects for industrial and commercial users of urban gas enterprises │ Design and application of urban gas pipeline network SCADA systems │ Design and implementation of urban gas pipeline network SCADA systems │ Comparison of urban gas pipeline design methods 3 │ Cathodic protection of urban gas buried steel pipes │ Several issues in the optimal design of urban gas pipeline networks │ Research on test methods for sacrificial anode cathodic protection of urban gas pipelines │ Causes and countermeasures of water seepage in urban gas valve wells │ Research and design of urban gas monitoring system based on Internet of Things technology │ Design and development of urban gas pipeline network lines based on risk assessment │ Natural gas expander decompression process cold energy cooling gas turbine air inlet │ Discussion on shielding of cathodic protection current of buried gas pipelines by casing │ Aesthetic issues of indoor gas pipelines and gas meters │ Application and evaluation of gas economizers in industrial heating furnaces │ Technical comparison of today's commercial gas turbines │ Discussion on gas transmission and distribution technology in gas engineering │ Research on the preparation of CO-rich gas and energy-carrying materials in new coal gasification furnaces │ Design of forced current cathodic protection for new buried steel gas pipelines │ Analysis of a gas-steam combined cycle scheme for a certain type of gas turbine │ Optimization of the filter structure of a certain heavy-duty gas turbine gas system │ Application of flexible anode cathodic protection method in the field of urban gas│ Application of water replacement method in gas engineering│ Mechanical processing of high-temperature alloy materials for steam turbines│ Asphalt mixing equipment gas burner debugging and gas consumption calculation methods│ Analysis of typical accidents of oil field horizontal gas heating processor fire drum bulging│ Brief analysis of the anti-corrosion and cathodic protection of urban gas steel pipes│ Brief analysis of the application of Internet of Things intelligent gas systems in the gas industry│ A brief discussion on gas transmission and distribution technology in gas engineering │ A brief discussion on the alignment of gas turbine driven compressor units │ Design of maintenance and operation platform for gas turbine generator sets on offshore platforms │ Research on the environmental impact of gas-steam combined cycle power generation system life cycle │ Brief analysis of gas enterprise development strategies - taking AB gas as an example │ Analysis of energy-saving potential for fixed heating supply of gas heating system │ Gas-fired cooling, heating and power triple generation system │ Comparison of gas distributed system heating and decentralized gas boiler heating solutions │ Methods for preventing weld cracking of U-shaped gas radiant tubes in gas heating furnaces │ Research on the application of gas engine lubricating oil in heavy-duty gas engines │ Research on gas engine unit control system methods │ Brief analysis of gas transmission and distribution technology in gas engineering projects │ Gas transmission and distribution technology in gas engineering projects │ Gas pipeline transformation and effect evaluation of gas hot blast furnace constant light natural gas pipelines │ Development of buried polyethylene valve sealing and torsion testing machine for gas │ Valve sealing tester for gas │ Gas pipeline failure consequence scoring index system │ Selection of gas pipeline materials │ Numerical simulation analysis of low temperature relief of gas system │ Application of gas turbine compressor unit in West-East Gas Pipeline │ Analysis of causes of bolt breakage of gas turbine and compressor couplings │ Selection of gas turbines in natural gas transmission pipelines 5 │ Gas turbine booster station anti-surge system control analysis 4 │ Problems and solutions during gas turbine overhaul 3 │ Gas turbine control system-Mark VI introduction 5 │ Gas turbine gas steam combined cycle technology analysis 5 │ Gas turbine gas nozzle flow test and flow detection device design │ Gas turbine water washing 2 │ Gas turbine air compressor surge causes and solutions │ Discussion on the importance of gas transmission difference control to gas companies │ Discussion on the application of gas transmission and distribution technology in gas engineering projects │ Practice of sacrificial anode cathodic protection of gas steel pipelines │ Application of sacrificial anode cathodic protection in Shekou gas pipelines │ Experimental research on the combustion characteristics of biogas and biogas mixed with hydrogen │ Experience in the application of petrochemical industry combustible gas and toxic gas detection alarm design specifications │ Comparison of two driver solutions for pipeline centrifugal compressors (industrial gas turbines and variable speed motors) │ Application of insulating joints in cathodic protection systems for gas pipelines │ Research on the selection and maintenance plans of Liwan 3-1 gas turbine compressors │ On gas franchise rights - from the perspective of state-owned gas enterprises │ On the selection and matching of gas turbines in natural gas pipelines │ Discussion on self-discipline of Guizhou bottled gas market - analysis of "Zunyi bottled gas model" │ The adaptability of ultrasonic gas meters in the field of household gas metering │ Analysis and research on mechanical seals of ultra-high-speed gas turbine pumps │ Application of cathodic protection remote transmission monitoring systems on urban gas pipelines (Fu Shanlin) │ Design and application of prefabricated integrated reinforced concrete gas valve wells │ └─16.2 Gas Engineering Courseware (GE) 9F Evolution of Gas Turbine Application of GIS in Urban Gas Pipeline Network 48.ppt tarus70 gas turbine engine technology.PPT Titan 130 gas turbine technology.ppt China Gas LNG Training PPT 74 Condensing Gas Water Heater PPT 119 Pressure Pipeline Design Approval Personnel Training Urban Gas Chapter 110.ppt Training for pressure pipeline design and approval personnel - city gas.ppt Overview of the development of domestic gas waste heat boilers.ppt Introduction to foreign large-capacity gas waste heat boilers.ppt City gas part.ppt Preparation of completion acceptance documents for urban gas projects 88.ppt Urban Gas Pipeline.ppt Hercules 130 Gas Turbine Technology.ppt Installation Project Pricing Chapter 4 Water Supply, Drainage, Heating, and Gas Engineering PPT 115 Conventional Gas Project Completion Acceptance Management 23.ppt Yanmar heat pump gas air conditioning technology exchange meeting PPT 57 gas.ppt Gas purification PPT 38-page gas compressor structural principle and common faults PPT 23.ppt Structural principles and common faults of gas compressors.ppt Gas industrial boiler furnace heat exchange calculation PPT 28 Gas turbine engine-bearings, seals, accessory transmission PPT 81 pages Gas water heater proportional valve working principle and product introduction training 27.pptx Gas heat pump unit and solar boiler system PPT 63 gas pipeline installation 17.ppt Gas pipeline engineering construction design, installation cost, pricing and bill of quantities preparation 22.ppt Gas pipeline welding connection technology 42.ppt Discussion on the gas pipeline entering the comprehensive pipeline gallery 23.ppt Gas self-closing valve 34.ppt Working Principle of Gas Pressure Regulator PPT 5 Gas Turbine and Compressor Training Materials 107.ppt Research on optimal design of gas turbine waste heat boiler 52.ppt Compilation of operation manual of gas turbine centrifugal compressor unit PPT 240 Basic structure and selection of fuel-fired gas boiler PPT 204 Chapter 1 Gas Storage PPT 49 Chapter 5 Indoor Gas Facilities 47.ppt Chapter 5 Gas Pipelines and Ancillary Equipment 34.ppt Chapter 5 Key Points of Gas Pipelines and Ancillary Equipment 39.ppt Chapter 5 Gas Pipelines and Ancillary Equipment 59.ppt Siemens gas turbine design features 62
Reply #22024-09-23
Learn together* , improve together! Happy communication, happy sharing! !
Reply #32024-09-23
Give roses to others and leave a lingering fragrance in your hands. Thank you Teacher Dong for sharing.
Reply #42024-09-23
The Shutong database is always open for you, always looking forward to your growth!
Reply #52024-09-23
The Shutong database is always open for you, always looking forward to your growth!
Reply #62024-09-23
Thank you Mr. Dong for sharing! Learn every day * Make some progress.
Reply #72024-09-23
Thank you, Mr. Dong, let’s learn together* , make progress together!
Reply #82024-09-23
Study hard* Every day, thank you for sharing the information.
Reply #92024-09-23
I always wish the book boy peace. Thank you for accompanying me on this journey of study.* , brothers and sisters, I wish the book boy a happy day!
Reply #102024-09-23
Thanks to Shutong Database for sharing, many urgently needed information can be obtained from Shutong!
Reply #112024-09-23
Thanks to the Shutong database for accompanying me in my studies* , work and life!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.