HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Fundamental issues of vertical heat exchangers

2016-07-19View Original

Thread Content

There is a vertical heat exchanger with a diameter of 3.2 meters, a height of 16 meters, and a total weight of 75 tons; it needs to be able to withstand an earthquake load of 0.1g. How should the foundation bolts for this heat exchanger be installed? It might not be sent to the right place, but I really don’t know who to ask; please forgive me, moderators
Reply #22016-08-12
The exact installation location is not yet known, but you can calculate the size of the foot bolts by referring to the calculations for the supports. The main forces to consider are the horizontal forces resulting from earthquakes (vertical forces also need to be taken into account if the seismic intensity is above level 8), as well as wind loads.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.