HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues regarding the modification of the heating steam in high-pressure deaerators

2016-07-19View Original

Thread Content

Dear sea friends, I have a question that requires your help to answer: At present, the heating steam for our company’s boiler deaerator comes from the exhaust gas drawn by the generator. The operating pressure of the deaerator is 0.5 MPag, with a water temperature of 158°C. The heating steam, after being depressurized to 0.6 MPag, has a temperature of 310°C; the amount of steam used is around 24 tons. The company currently has some excess steam (0.7 MPag, 175°C). I would like to reduce the pressure of this steam and mix it with the steam used for heating the deaerator in order to supply it to the deaerator; the required amount is around 5-8 tons. Is this approach feasible? If so, what aspects should be taken into consideration during operation to ensure the stable functioning of the deaerator?
Reply #22016-07-19
It is feasible to use the excess steam exclusively for the deaerator; it is not recommended to route it along with the heating steam. Due to its low temperature, it is advisable to preheat this excess steam before using it. Otherwise, when it is used in the deaerator, it will not provide any heating effect, and there will also be a large amount of condensed water, which will overload the deaerator
Reply #32016-07-19
Let’s discuss it together. Isn’t heating water mainly achieved by utilizing the enthalpy of steam? The enthalpy of the excess steam is roughly similar to that of the main steam, and a smaller amount of it is used; basically, around 5 tons are intended to be used. The temperature after mixing also reaches over 280 degrees. Will there be any problems?
Reply #42016-07-20
Dear sea friends, please leave a comment and give me some advice.
Reply #52016-07-22
Why isn’t anyone participating?:(:(:(
Reply #62018-06-19
The renovation is complete; it’s ready for testing and deployment. I’m hoping for good results. ‘’1
Reply #72019-05-25
How is the result after the renovation?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.