HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The boiler is leaking

2015-11-20View Original

Thread Content

After a boiler leaks, due to the high temperature and pressure, it is necessary to reduce the temperature and pressure each time it is repaired. This process takes a long time, which has a significant impact on production volume and the system’s operational efficiency. Does anyone have any good methods or techniques for this issue?
Reply #22015-11-25
Only by strictly controlling the quality of maintenance during overhauls, using high-quality valves, and employing metal gaskets can this be achieved. Minimize the number of times of parking for pressure relief.
Reply #32015-11-28
It depends on where the leak occurs; in such cases, it usually takes 48 hours to reduce the temperature and relieve pressure. If the location of the leak is easy to identify and it can be addressed from the outside, sealing it directly from the outside is the fastest way. The key is to locate the leakage points, not to reduce temperature or pressure

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.