Installation of vertical thermosyphon reboiler

2016-08-08View Original

Thread Content

I would like to ask: When installing a vertical thermosyphon reboiler, is the normal liquid level in the reboiler tank determined based on the amount of material taken out from the bottom of the tower over a period of 5 to 15 minutes? Is the reboiler then installed so that its liquid level is at the same level as the upper tube sheet? How should the heights of the vapor return port at the top of the reboiler and the material inlet at the bottom be determined?
Reply #22016-08-08
The feed inlet should be at the same horizontal level as the feed inlet of the bottom pump of the tower, while the vapor return inlet should be above the highest liquid level in the tower bottom, usually below the lowest tray; the exact values need to be provided by the design agency

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.