As title
Reply #22016-08-11
Most of the instrument trays in chemical processing units are laid together with the pipe racks. I wonder if there are any standards to follow.
Reply #32016-08-11
I haven’t seen any guidelines, but it seems best to keep them separate, because if gas leaks into the instrumentation pipelines, static electricity could also generate sparks
Reply #42016-08-11
It’s best if they can be separated...
Reply #52016-08-11
Typically, process pipelines are arranged on the lower layer of the pipe rack, while utility pipelines are arranged on the upper layer. If there is space on the upper level to install instrument trays and cable trays, or if an additional layer of instrument cable trays can be installed above the pipes, a clear distance of 1 meter should be maintained between the two.
Reply #62016-08-12
It seems that the design in our factory doesn’t include any separation layers; the process pipelines and cable trays are placed right next to each other :P:)

Submit a Project

Need technical support or have a project requirement? No registration needed.

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.