HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Topic】【Civil Engineering Version 20160815】

2016-08-15View Original

Thread Content

This post was last edited by hesonchang214 on 2016-8-20 at 16:34. Reward for participation: 2 Wealth. Reward for the correct answer: 9 wealth. When carrying out formal piling work, it is advisable to use ( ) method, which can yield good results. A. Heavy hammer struck low, then lifted high and struck forcefully. B. Light hammer struck high, then lifted high and struck forcefully. C. Light hammer struck low, then lifted low and struck gently. D. Heavy hammer struck high, then lifted high and struck forcefully. Correct answer: A
Reply #22016-08-15
A. Strike the weight downward, then lift it low and strike hard
Reply #32016-08-15
A. Strike the weight downward, then lift it low and strike hard
Reply #42016-08-15
A. Strike the weight downward, then lift it low and strike hard
Reply #52016-08-15
A. Strike the weight downward, then lift it low and strike hard
Reply #62016-08-15
A. Strike the weight downward, then lift it low and strike hard

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.