HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Topic】【Civil Engineering Version 20161006】

2016-10-06View Original

Thread Content

This post was last edited by hesonchang214 on 2016-10-6 08:32. Reward for participation: 2 Wealth. Reward for correct answer: 9 Wealth. In accordance with the requirements for preparing as-built drawings, if there are significant changes in the structural design, construction methods, layout, or other aspects of the project, or if the area of changes on the drawings exceeds ( ), it is necessary to redraw the as-built drawings. A. 20% B. 40% C. 35% D. 30% Correct answer: C
Reply #22016-10-06
According to the requirements for preparing as-built drawings, in cases of significant changes in the structural design, construction methods, floor plan, or project details, or when the area of changes on the drawings exceeds ( ), the as-built drawings must be redrawn. B.40%

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.