What engineering documents need to be understood throughout the entire construction process! 1. Pre-construction information 1. Bid winning notice and construction permit 2. Construction contract 3. Supervision contract for the entrusted supervision project 4. Construction drawing review approval letter and construction drawing review report 5. Quality supervision registration letter 6. Quality supervision disclosure points and quality supervision work plan 7. Geotechnical engineering survey report 8. Construction drawing joint review record 9. Construction organization design or construction plan approved by the supervisor (or owner) 10. Commencement report 11. Quality management system registration form 12. Construction site quality management inspection record 13. Technical disclosure record 14. Measurement positioning record 2. Quality acceptance data 1. Foundation groove inspection record 2. Foundation pile project quality acceptance report 3. Foundation treatment project quality acceptance report 4. Foundation and foundation division project quality acceptance report 5. Main structure division project quality acceptance report 6. Special division project quality acceptance report 7. Line laying acceptance report 8. Quality acceptance records of the foundation and foundation division and its sub-divisions, sub-items and inspection batches 9. Quality acceptance records of the main structure division and its sub-divisions, sub-items and inspection batches 10. Quality acceptance records of the decoration and decoration division and its sub-divisions, sub-items and inspection batches 11. Quality acceptance records of the roofing division and its sub-divisions, sub-items and inspection batches 12. Water supply, drainage and heating division and its sub-divisions, sub-items, and inspection batch quality acceptance records 13. Electrical division and its sub-divisions, sub-items, and inspection batch quality acceptance records 14. Intelligent division and its sub-divisions, sub-items, and inspection batch quality acceptance records 15. Ventilation and air-conditioning division and its sub-divisions, sub-items, and inspection batch quality acceptance records 16. Elevator division and included sub-divisions, sub-items, and inspection batch quality acceptance records 17. Unit projects and included sub-unit project quality completion acceptance records 18. Outdoor project divisions (sub-divisions), sub-items, and inspection batch quality acceptance records 3. Test data 1. Cement physical performance inspection report 2. Sand and stone inspection report 3. Concrete mix ratio test report for each strength grade 4. Concrete test piece strength statistics table, evaluation table and test report 5. Mortar mix proportion test report for each strength grade 6. Mortar specimen strength statistical table and test report 7. Brick, stone, and block strength test report 8. Steel mechanics and bending performance inspection report and steel bar welded joint tensile and bending inspection report or steel bar mechanical connection joint inspection report 9. On-site re-inspection report for the mechanical properties of prestressed tendons, steel wires, and steel strands 10. Pile foundation engineering test report 11. Steel structure engineering test report 12. Curtain wall engineering test report 13. Waterproof material test report 14. Test report for metal and plastic exterior doors and windows (including materials and three properties) 15. Pull-out strength test report for exterior wall facing tiles 16. Acceptance test report for lightning protection device of building (structure) 17. Test report for compactness of backfill soil with special requirements or design requirements 18. Other test reports stipulated in quality acceptance specifications 19. Basement waterproofing effect inspection record 20. Ground water storage test record with waterproofing requirements 21. Roof water spray test record 22, Exhaust (air) duct inspection record 23, Energy saving, insulation test record 24, Pipeline, equipment strength and tightness test record 25, System cleaning, water filling, water passing, ball passing test record 26, Lighting full load test record 27, Large lamps and lanterns robustness test record 28, Electrical equipment debugging record 29, Electrical engineering grounding and insulation resistance test record 30, Strength and tightness test records of refrigeration, air conditioning, and pipelines 31. Trial operation and debugging records of refrigeration equipment 32. Trial operation and debugging records of ventilation and air-conditioning systems 33. Air volume and temperature test records 34. Elevator equipment unpacking inspection records 35. Elevator load test and safety device inspection records 36. Elevator grounding and insulation resistance test records 37. Elevator trial operation and debugging records 38. Intelligent building engineering system trial operation records 39. Intelligent building engineering system function measurement and equipment debugging records 40. Other measurements, tests, inspections, tests, debugging and trial operation records necessary for the safety and functional inspection of the unit (sub-unit) project 4. Certificate information for materials, products, components and accessories 1. Factory certificate for cement (including 28-day reinforcement report) 2. Factory certificate for bricks and blocks 3. Factory certificate for steel bars, prestressed steel wires, steel strands, sleeves 4. Factory certificate for steel piles, concrete prefabricated piles and prestressed pipe piles 5. Steel structure engineering components and accessories, material factory certificate 6, curtain wall engineering accessories, material factory certificate 7, waterproof material factory certificate 8, metal and plastic doors and windows factory certificate 9, welding rod and flux factory certificate 10, prefabricated components, ready-mixed concrete certificate 11, water supply, drainage and heating engineering materials factory certificate 12, construction electrical engineering materials and equipment factory certificate 13. Ventilation and air-conditioning engineering materials and equipment factory certificate 14. Elevator engineering equipment factory certificate 15. Intelligent building engineering materials and equipment factory certificate 16. Other certificates required for construction 5. Construction process data 1. Design changes and negotiation records 2. Engineering measurement and setting-out records 3. Pre-inspection, self-inspection, mutual inspection, handover inspection records 4. Building (structure) settlement observation and measurement records 5. New materials, new technologies, and new technology construction records 6. Concealed project acceptance record 7. Construction log 8. Concrete opening report 9. Concrete construction record 10. Concrete mix ratio measurement and spot check record 11. Project quality accident report sheet 12. Project quality accident and accident cause investigation and handling records 13. Project quality rectification notice 14. Project partial suspension notice 15. Project quality rectification report and resumption application 16. Project resumption notice 6. Information that should be supplemented when necessary 1. Qualification certificates of survey, design, supervision, and construction (including subcontracting) units 2. Changes, replacements and reasons of construction, survey, design, supervision, and construction (including color separation) units 3. Professional qualification certificates of practitioners in survey, design, and supervision units 4. Employment certificates of on-site management salespersons and technical workers of various types of construction (including subcontracting) units 5. Supervision planning or supervision implementation details approved by the construction unit (owner) 6. Letter of authorization or authorization from the design representative dispatched by the witnessing unit to the construction site 7. Letter of authorization or authorization from the design representative dispatched by the design unit to the construction site 8. Others 7. Completion information 1. Project completion report of the construction unit 2. Project completion quality evaluation report of the supervision unit 3. Survey documents and implementation inspection report of the surveying unit 4. Design document and implementation inspection report of the design unit 5. Opinion letter on completion acceptance of construction project quality or project quality completion acceptance record of the unit (sub-unit) 6. Notice of rectification of problems existing in the completion acceptance 7. Letter of rectification and acceptance of problems existing in the completion acceptance 8. Notification of the completion acceptance conditions of the project and notice of reorganization of the completion acceptance 9. Unit (sub-unit) project quality control data verification record (quality assurance data review record) 10. Unit (sub-unit) project safety and functional inspection data verification and main function spot inspection record 11. Unit (sub-unit) project visual quality inspection record (perception quality assessment form) 12. User-signed opinion form for targeted sales of commercial housing or employee-funded housing 13. Project quality warranty contract (book) 14. Construction project completion acceptance report (to be filled out by the construction unit) 15. Completion drawings (including intelligent building division) 8. Construction project quality supervision archived information 1. Construction project quality supervision registration form 2. Construction drawing review and approval and construction project construction drawing review report 3. Unit project quality supervision work plan 4. Construction project quality supervision clarification meeting notice and key points 5. Construction project quality supervision record 6. Construction project quality management system registration form 7. Construction site quality management inspection record 8. Foundation and foundation pile project quality supervision and acceptance inspection notice 9. Foundation trench inspection record and foundation pile project quality acceptance report 10. Foundation and foundation pile project quality inspection record 11. Foundation treatment measures and foundation treatment project quality acceptance report issued (or approved) by the design unit 12. Quality supervision and acceptance inspection notice and acceptance report of the foundation and foundation division project 13. Quality supervision and acceptance inspection notice and acceptance report of the foundation and foundation division project 14. Quality supervision and acceptance inspection notice and acceptance report of the main structure division project 15. Quality supervision and acceptance inspection notice and acceptance report of the main structure division project 16. Quality supervision and acceptance inspection notice and acceptance report of the special part project 17. Quality supervision and acceptance inspection notice and acceptance report of the line laying project 18. Steel mechanics and bending performance inspection report and steel structure welded joint tensile and bending inspection report 19. On-site re-inspection report of mechanical properties of prestressed tendons, steel wires and steel strands 20. Cement physical property inspection report 21. Concrete specimen strength statistical table and evaluation table test report 22. Assembly or prefabricated component structural performance inspection certificate and construction joints and joints. The concrete strength test report when the concrete withstands full construction load and full load 23. Waterproof concrete, sprayed concrete compression and anti-permeability test reports and anchor bolt resistance test reports 24. Foundation strength (bearing capacity) test results of various foundations and various composite foundations in foundation treatment projects 25. Pile test reports for pile foundation projects 26. Mortar strength statistical tables and specimen test reports 27. Brick, stone, and block strength test reports 28. Test reports for harmful substances and indoor environment of construction engineering materials 29. Re-inspection report of waterproofing materials (including waterstop strips and joint sealing materials), thermal insulation and sealing materials 30. Re-inspection report of metal and plastic exterior doors and exterior windows (including materials, wind pressure resistance, air permeability, water permeability) 31. Pull-out strength test report of exterior wall facing tiles 32. Complete machine installation acceptance report for various types of elevators, escalators and moving walkway installation projects 33. Hidden acceptance of various equipment installation projects, system linkage, system debugging and system installation acceptance records 34. Concrete floor panel thickness drilling and spot inspection records 35. Project quality accident report 36. Project quality rectification notice and project partial suspension notice 37. Project quality resumption opinion letter and project quality resumption notice 38. Unit (sub-unit) project quality control data verification record (quality assurance data review record) 39. Unit (sub-unit) project safety and functional inspection data verification and main function spot inspection records 40. Unit (sub-unit) project visual quality inspection record (perspective quality assessment form) 41. Construction unit project completion report 42. Supervision unit project completion quality evaluation report 43. Survey unit survey document and implementation status inspection report 44. Design unit design document and implementation status inspection report 45. Construction project completion acceptance report 46. Project completion acceptance supervision and inspection notice 47. Quality assurance data verification record 48. Unit (sub-unit) project quality completion acceptance record (project quality completion acceptance opinion letter) 49. Reorganization completion acceptance notice 50. Project completion re-inspection opinion letter 51. Completion acceptance problem rectification notice and problem rectification acceptance opinion letter 52. Project quality warranty contract 53. Unit (sub-unit) project quality supervision report note: Complete data storage and quality monitoring station for curtain walls, steel structures and grids