HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Problems with the transformer

2016-10-13View Original

Thread Content

During the company’s major maintenance, the load on the transformer was changed from 5W to 2W. There are frequent power outages when the machine is in operation, and the current level also fluctuates. What could be the reason for this?
Reply #22016-10-14
Has the transformer load been changed from 5W to 2W? The bulb of a flashlight is probably around a few watts. Does 5W refer to 50,000 KVA? The transformer capacity is reduced, while the original load remains unchanged; trying to use a weak engine to drive a heavy load will lead to problems

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.