HCBBS Forum (English)

The light components in Changsan-line oil are present in high amounts, resulting in significant overlap with the boiling range of Changer-line oil

Thread Content

How to do a good job at adjustment?
Reply #22016-10-18
Reduce the mid-stage circulation volume in Chang Er Middle School and increase the temperature at the circulation outlet. Lines are often drawn multiple times on the secondary line.
Reply #32016-10-23
Adjust the circulation volume in Unit 2 to increase steam injection at the bottom of the tower

Submit a Project

Need technical support or have a project requirement? No registration needed.

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.