Procedures for establishing a gas station

2016-11-18View Original

Thread Content

Who knows anything about the procedures for setting up a gas station, what documents are required, and especially how to obtain the franchise rights? Please help explain, thank you!
Reply #22016-11-18
Process for building a gas station – The general procedure for constructing a gas station is such that the construction of a natural gas filling station must be carried out in accordance with **relevant construction regulations and approval procedures. Completing the preliminary procedures for a CNG station is a prerequisite and essential condition for the smooth construction of such a station; it also serves as the foundation and guarantee for carrying out the subsequent operational procedures. Gas stations are different from ordinary buildings; their construction goes through strict scrutiny. After the initial inspection upon completion of construction, they must undergo various types of inspections and obtain approvals as well as certificates issued by the relevant authorities. Preparatory procedures for building a gas station: Project feasibility study report (or project proposal), approval document for project initiation (issued by the Development and Reform Commission), approval letter for land use, state-owned land use certificate (issued by the Land and Resources Bureau), topographic survey map (accompanied by a vectorized CD from the surveying agency), planning boundaries (issued by the Planning Bureau), geological survey report (prepared by the surveying agency), construction drawings (prepared by the design agency), planning permit (issued by the Planning Bureau), review opinion on construction drawings (issued by the Urban Construction Commission’s Drawing Review Office), construction permit for building projects (issued by the Urban Construction Commission), review opinion on fire protection design for building projects (issued by the Fire Department), approval of safety assessment report (issued by the Work Safety Supervision Bureau), approval of environmental impact assessment report (issued by the Environmental Protection Bureau), application form for supervision and inspection of the safety and quality of pressure pipeline installation (submitted by the client to the technical supervision agency), notice of installation, modification, or repair of special equipment (submitted by the construction contractor to the technical supervision agency and one copy is provided to the client for record-keeping). Post-construction procedures for gas station construction: Fire safety inspection report for construction projects (Fire Department), license for handling hazardous chemicals (Work Safety Supervision and Administration Bureau), quality inspection report for pressure vessels (Autonomous Region Boiler and Pressure Vessel Quality and Safety Inspection Institute), business license (Industry and Commerce Bureau), enterprise organization code certificate (Autonomous Region Quality and Technical Supervision Bureau), inspection report on lightning and static electricity protection facilities (Autonomous Region Product Quality Inspection Institute), pressure vessel usage permit, gas cylinder filling permit (Autonomous Region Quality and Technical Supervision Bureau), property ownership certificate, etc. I. Site Selection (1) The construction unit should be familiar with the policies and standards regarding site establishment. The site should be located in an urban area or along major traffic routes, near sources of water, electricity, and gas; it should have a large market potential, be close to transportation routes for easy access, and meet the fire safety, environmental protection, and security requirements specified in urban planning and relevant standards. This will serve as the initial candidate for the site location ; (2) The competent authorities, as well as those responsible for construction, planning, safety supervision, fire protection, environmental protection, and design, shall be present at the designated site. (3) Go to the land administration department to handle the procedures for land expropriation and obtain the land use certificate; (4) Go to the planning department to obtain the planning permit for land use and the construction permit. II. Project Approval (1) The project owner submits an application to the local industry and management department (Development and Reform Commission) to establish the facility ; (2) Provide relevant documents: project initiation report (project proposal), feasibility study report, site selection report ; (3) Approval for project initiation by the industry regulatory authority or the Development and Reform Commission. III. Design
Reply #32016-11-19
http://wenku.baidu.com/view/6a59e240b307e87101f69678.html This one is relatively comprehensive; it is recommended as a reference. 18005355027
Reply #42016-11-19
How can a franchise be obtained? What documents need to be submitted, and which department should be approached for approval? Urgent, thank you!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.