HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Are there any specifications or best practices regarding the installation of one-way valves at the boundaries of refining units?

2016-11-22View Original

Thread Content

As title: Issues with the installation of one-way valves at the boundaries of refining units.
Reply #22016-11-22
Refer to the specific provisions in Article 3.3 of SH/T3122
Reply #32016-11-22
Check valves are rarely installed at the device boundaries. We installed check valves on the alkali slag line, as multiple workshops share one main pipeline. Moreover, the pipeline needs to be cleaned after each use, and it is the workshop that uses it that is responsible for cleaning it; the other workshops do not need to do so. Therefore, check valves are installed on the main pipelines of each workshop.
Reply #42016-11-23
It is beneficial for equipment maintenance, purging, pressure testing, starting up and shutting down, etc. It is advisable to use an 8-shaped blind plate between the two valves; if possible, having a drain point at a lower position would also be good, as this could create a zero-pressure section!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.