HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How are process drawings numbered?

2016-11-29View Original

Thread Content

How should drawings for the chemical engineering process specialty be numbered? Are there any specific standards or guidelines? I would appreciate some advice, thank you!
Reply #22016-11-29
It’s not clear where the numbering rules come from; on 20519, there is only a list of the components of the drawing file. This numbering system is established by our design institute as an internal rule, or perhaps it could be a rule set by the project team as well

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.